NukeWorker.com: Nuclear Jobs, Resumes, Outage Schedules, & RCT Training

NukeWorker Menu

Other Services

Outage Schedules Gold Member Study Guides Upload Picture View Pictures Calendar Quiz Help Search for User

Nuclear Pictures

NukeWorker online photo album.

Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.
The Waste Retrieval Project is an interim step in the final remediation of Silos 1 and 2. 8,900 cubic yards of waste material from the silos will be moved to temporary transfer tanks. This material was generated from 1951 to 1960 as a waste by-product generated from the processing of high-grade uranium ores. The Silos 1 and 2 material, also known as K-65 material, contains radium and thorium radionuclides. The contractor will design, construct, test, maintain and operate the systems and sub-systems associated with the Waste Retrieval Project. Removal of the silos soil berm is also included in the scope of work. The Waste Retrieval Project will consist of six major systems; Silos Waste Retrieval System; Decant Sump Waste Retrieval System; Transfer Tank Area; Transfer Tank Waste Retrieval System; Radon Control System; and the Full Scale Mock-up System. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)

Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.

The Waste Retrieval Project is an interim step in the final remediation of Silos 1 and 2. 8,900 cubic yards of waste material from the silos will be moved to temporary transfer tanks. This material was generated from 1951 to 1960 as a waste by-product generated from the processing of high-grade uranium ores. The Silos 1 and 2 material, also known as K-65 material, contains radium and thorium radionuclides. The contractor will design, construct, test, maintain and operate the systems and sub-systems associated with the Waste Retrieval Project. Removal of the silos soil berm is also included in the scope of work. The Waste Retrieval Project will consist of six major systems; Silos Waste Retrieval System; Decant Sump Waste Retrieval System; Transfer Tank Area; Transfer Tank Waste Retrieval System; Radon Control System; and the Full Scale Mock-up System.

2012978.jpg 2012964.jpg 2012969.jpg 2012962.jpg 3.jpg
File information
Filename:2012969.jpg
Album name:Rennhack / Fernald (FEMP)
Keywords:Fernald / Closure / Project / Fernald / Green / Salt / Plant, / Feed / Materials / Production / Center, / Fernald, / Ohio / (FEMP)
Date:Jan-31-2004
Credits:DOE Photo
Filesize:54 KiB
Date added:Oct 30, 2005
Dimensions:288 x 192 pixels
Displayed:1167 times
URL:https://www.nukeworker.com/pictures/displayimage.php?pid=3968
Favorites:Add to Favorites