Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.
Plants 2 and 3, the Ore Refinery Plants, were used to convert feed materials and recycled scrap to high purity uranium trioxide (UO3). Three processes were used during the conversion: digestion, where uranium was converted to soluble uranyl nitrate; extraction, where uranyl nitrate was extracted by a solvent mixture; and denitration, where high purity uranyl nitrate was converted to UO3. The D&D of the plants consists of surface decontamination, building and equipment dismantlement, size reduction of building material and the loading of demolition debris into rolloff boxes for transfer to the On-Site Disposal Facility. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)

Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.

Plants 2 and 3, the Ore Refinery Plants, were used to convert feed materials and recycled scrap to high purity uranium trioxide (UO3). Three processes were used during the conversion: digestion, where uranium was converted to soluble uranyl nitrate; extraction, where uranyl nitrate was extracted by a solvent mixture; and denitration, where high purity uranyl nitrate was converted to UO3. The D&D of the plants consists of surface decontamination, building and equipment dismantlement, size reduction of building material and the loading of demolition debris into rolloff boxes for transfer to the On-Site Disposal Facility.

2012963.jpg fernald_cells_1.jpg 2012965.jpg 2012983.jpg 2012978.jpg
File information
Filename:2012965.jpg
Album name:Rennhack / Fernald (FEMP)
Keywords:Fernald / Closure / Project / Fernald / Green / Salt / Plant, / Feed / Materials / Production / Center, / Fernald, / Ohio / (FEMP)
Date:Jan-31-2004
Credits:DOE Photo
Filesize:70 KiB
Date added:Oct 30, 2005
Dimensions:233 x 350 pixels
Displayed:1035 times
URL:https://www.nukeworker.com/pictures/displayimage.php?pid=3972
Favorites:Add to Favorites