NukeWorker.com: Nuclear Jobs, Resumes, Outage Schedules, & RCT Training

NukeWorker Menu

Other Services

Outage Schedules Gold Member Study Guides Upload Picture View Pictures Calendar Quiz Help Search for User

Nuclear Pictures

NukeWorker online photo album.

An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.
8,900 cubic yards of high activity low-level waste material will be removed from Silos 1 and 2, processed and shipped off site for disposal. This material was generated from 1951 to 1960 as a waste by-product from the processing of high-grade uranium ores. The Silos 1 and 2 material, also known as K-65 material, contains radium and throium radioclides. Waste Retrieval Project will consist of six major systems; Silos Waste Retrieval System; Decant Sump Waste Retrieval System; Transfer Tank Area; Transfer Tank Waste Retrieval System; Radon Control System; and the Full Scale Mock-Up System. Once the waste is removed from the silos it will then be stabilized with a formulation of flyash and Portland cement before being containerized for shipment. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)

An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.

8,900 cubic yards of high activity low-level waste material will be removed from Silos 1 and 2, processed and shipped off site for disposal. This material was generated from 1951 to 1960 as a waste by-product from the processing of high-grade uranium ores. The Silos 1 and 2 material, also known as K-65 material, contains radium and throium radioclides. Waste Retrieval Project will consist of six major systems; Silos Waste Retrieval System; Decant Sump Waste Retrieval System; Transfer Tank Area; Transfer Tank Waste Retrieval System; Radon Control System; and the Full Scale Mock-Up System. Once the waste is removed from the silos it will then be stabilized with a formulation of flyash and Portland cement before being containerized for shipment.

fernald_cells_5.jpg fernald_cells_2.jpg 2012981.jpg 2012963.jpg fernald_cells_1.jpg
File information
Filename:2012981.jpg
Album name:Rennhack / Fernald (FEMP)
Keywords:Fernald / Closure / Project / Fernald / Green / Salt / Plant, / Feed / Materials / Production / Center, / Fernald, / Ohio / (FEMP)
Date:Feb-29-2004
Credits:DOE Photo
Filesize:48 KiB
Date added:Oct 30, 2005
Dimensions:288 x 192 pixels
Displayed:1056 times
URL:https://www.nukeworker.com/pictures/displayimage.php?pid=3975
Favorites:Add to Favorites