Help | Contact Us
NukeWorker.com
NukeWorker Menu

Nuclear Pictures

NukeWorker online photo album.

Shika
Location: Ishikawa
Operator: Hokuriku Electric Power Co
Configuration: 1 X 540 MW BWR
Operation: 1993
Reactor supplier: Hitachi
T/G supplier: Hitachi
Quick facts: A 1,358-MW ABWR is under construction at Shika for service in 2006.

Shika

Location: Ishikawa
Operator: Hokuriku Electric Power Co
Configuration: 1 X 540 MW BWR
Operation: 1993
Reactor supplier: Hitachi
T/G supplier: Hitachi
Quick facts: A 1,358-MW ABWR is under construction at Shika for service in 2006.

first-nps.jpg third-nps.jpg Shika.jpg kola.jpg Rostov.jpg
File information
Filename:Shika.jpg
Album name:Rennhack / Japan
Rating (1 votes):33333
Credits:Hokuriku Electric Power Co Ltd
Filesize:9400 Bytes
Date added:Mar 11, 2005
Dimensions:298 x 205 pixels
Displayed:701 times
URL:https://www.nukeworker.com/pictures/displayimage.php?pid=2697
Favorites:Add to Favorites


NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2024 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?