Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).973 views
973 views
Fernald972 views
972 views
969 views
Fernald Environmental Project (FEMP)962 views
962 views
960 views
959 views
956 views
955 views
955 views
955 views
Workers Expose the Cell 6 Liner to Prepare the Surface for Attachment to the Cell 7 Liner.951 views
951 views
948 views
946 views
946 views
945 views
944 views
Conceptual Image943 views
943 views
942 views
942 views
941 views
941 views
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.940 views
An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.923 views
923 views
921 views
919 views
Fermald Map916 views
916 views
915 views
915 views
915 views
915 views
913 views
913 views
912 views
Fernald Map911 views
A Teamster Places Impacted Material Around Demolition Debris in Cell 4 of the On-Site Disposal Facility.910 views
909 views
909 views
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.907 views
907 views
906 views
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.902 views
900 views
900 views
899 views
897 views
Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.896 views
896 views
896 views
895 views
Two Crews Work to Remove Waste Material from Pit 2.894 views