Workers Install Insulation on Piping in the TTA Building.1068 views
1068 views
Fernald's K-65 Silos are Gone.1067 views
1067 views
1067 views
1066 views
1066 views
1065 views
1064 views
1064 views
1064 views
1063 views
1063 views
1063 views
1062 views
1062 views
1062 views
1061 views
1060 views
Fernald Environmental Project (FEMP)1059 views
1059 views
1058 views
1058 views
Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).1057 views
1057 views
A Supervisor Gives Instructions to an Operating Engineer in Pit 3.1056 views
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.1052 views
1052 views
1052 views
1052 views
1051 views
1050 views
1050 views
1050 views
1050 views
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).1049 views
1049 views
1048 views
1048 views
1048 views
1047 views
1046 views
Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.1045 views