A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).759 views
759 views
759 views
758 views
757 views
757 views
756 views
756 views
755 views
754 views
753 views
752 views
752 views
752 views
Operating Engineers use Grapplers and Bulldozers to Place and Compact Demolition Debris in Cell 4 of the On-Site Disposal Facility (OSDF).751 views
A Supervisor Gives Instructions to an Operating Engineer in Pit 3.738 views
Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).738 views
738 views
737 views
736 views
736 views
Fernald Environmental Project (FEMP)734 views
734 views
734 views
733 views
733 views
733 views
733 views
732 views
732 views
excavating the "flats"732 views
732 views
731 views
Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.729 views
729 views
729 views
729 views
729 views
Workers Expose the Cell 6 Liner to Prepare the Surface for Attachment to the Cell 7 Liner.728 views