NukeWorker Menu

Peach Bottom 1 — Nuclear Facility Information

Community ratings, technical specifications, photos, nearby jobs, satellite map, contact information, and per diem rates for Peach Bottom 1.

SAFSTOR

Permanently shut down on 1974-11-01.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
1848 Lay Road
Delta, PA 17563, USA
Get Directions
Phone: (717) 456-7014

Per Diem Data

?
GSA per diem rates for the area near this facility. Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel. Links open the official GSA rate lookup.

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Constellation Energy

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: HTGR
NSS Supplier: GA
Net Capacity: 40 MWe
Status: SAFSTOR

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Const. Permit: 1962-02-01
Operating Lic: 1967-01-27
Commercial Op: 1967-06-01