Ratings 36 votes

?
Community ratings from NukeWorker members. Vote to share your experience working at this facility. Results show the breakdown of Above Average, Average, and Below Average ratings.

Capacity Factor (365-Day)

100%
Current
94%
365-Day Avg
#53
of 94 plants
Min: 0% Max: 100% 21 days <80%

Scram History 6 events since 2011

6
Total
5
Automatic
1
Manual
2.8
Avg Recovery (days)
Recent Events
2025-07-29 Auto AUTOMATIC REACTOR TRIP The following information was provide...
2024-05-04 Auto EN Revision Imported Date: 7/8/2024 EN Revision Text: AUTOMA...
2021-06-20 Auto EN Revision Imported Date: 7/20/2021 EN Revision Text: REACT...
2019-09-22 Auto AUTOMATIC REACTOR TRIP DUE TO LOWERING STEAM GENERATOR LEVEL...
2018-06-03 Manual MANUAL REACTOR TRIP ON LOWERING STEAM GENERATOR WATER LEVEL"...
2018-04-29 Auto AUTOMATIC REACTOR TRIP FOLLOWING TURBINE TRIP"At 1124 CDT, B...

Performance Charts

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.

Power History (12-Month)

?
Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.

Outage Timeline

?
Visual timeline of all recorded outages. Blue bars are scheduled refueling outages, red bars are forced/unplanned outages. Width represents outage duration. Hover for details.

Facility Statistics

Lifecycle & Tenure
Operating Age: 37.7 Yrs
Build Time: 12.6 Yrs
Lic. Remaining: 20.5 Yrs
Production & Power
Lifetime CF: 95%
Efficiency: 32.5%
Generated: 268.3 TWh
Reliability & Outages
Record Run: 551 Days
Refuelings: 18

Ownership & Construction

Owner/Operator: Constellation Energy
Architect Engineer: S&L
Constructor: CWE

Technical Specs

Reactor Type: PWR
Containment: PWR-DRYAMB
NSS Supplier: WEST 4LP
Thermal Power: 3645 MWt
Net Capacity: 1183 MWe
Efficiency: 32.5%
Status: Operating

Licensing

Docket #: 05000456
License #: NPF-72
License Type: OL-FP
Const. Permit: 1975-12-31
Operating Lic: 1987-07-02
Commercial Op: 1988-07-29
License Renewed: 2016-01-27
License Exp: 2046-10-17

Facility Map

41.2434, -88.2297

Location & Contact

Address:
35100 South Route 53
Braceville, IL 60407, USA
Get Directions
Phone: (815) 417-2000

Breaker-to-Breaker Runs 12 runs

?
Breaker-to-breaker runs measure continuous operation between refueling outages (470+ days). An active streak means the unit has been running continuously since the last refueling. Longer runs indicate better reliability.
549
Best Run (days)
2001-10-13 → 2003-04-15
524
Avg Run (days)
All Runs
2022-10-23 2024-04-15 540 days
2019-10-23 2021-04-05 530 days
2018-06-06 2019-10-07 488 days
2016-10-27 2018-04-09 529 days
2015-04-19 2016-09-26 526 days
2013-10-01 2015-03-30 545 days
2012-05-20 2013-09-09 477 days
2010-11-06 2012-04-16 527 days
2007-10-26 2009-03-30 521 days
2003-05-02 2004-10-05 522 days
2001-10-13 2003-04-15 549 days
2000-04-06 2001-09-22 534 days