Ratings 105 votes

?
Community ratings from NukeWorker members. Vote to share your experience working at this facility. Results show the breakdown of Above Average, Average, and Below Average ratings.

Capacity Factor (365-Day)

100%
Current
88.6%
365-Day Avg
#52
of 94 plants
Min: 0% Max: 100% 44 days <80%

Scram History 14 events since 2011

14
Total
5
Automatic
9
Manual
8.9
Avg Recovery (days)
Recent Events
2026-01-17 Auto AUTOMATIC REACTOR TRIP The following information was provide...
2024-05-14 Manual UNIT 2 MANUAL REACTOR TRIP The following information was pro...
2024-03-21 Auto REACTOR TRIP DUE TO MAIN TURBINE TRIP The following informat...
2022-11-09 Auto AUTOMATIC REACTOR TRIP AND AUXILIARY FEEDWATER SYSTEM ACTUAT...
2021-06-21 Manual EN Revision Imported Date: 7/22/2021 EN Revision Text: MANUA...
2020-10-11 Auto AUTOMATIC REACTOR TRIP "At 0026 [EDT] on October 12, 2020, D...
2020-09-03 Manual MANUAL REACTOR TRIP AND AUTOMATIC SAFETY INJECTION "On Septe...
2019-07-20 Manual MANUAL REACTOR TRIP DUE NON-ESSENTIAL SERVICE WATER SYSTEM D...
+6 more events

Performance Charts

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.

Power History (12-Month)

?
Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.

Outage Timeline

?
Visual timeline of all recorded outages. Blue bars are scheduled refueling outages, red bars are forced/unplanned outages. Width represents outage duration. Hover for details.

Facility Statistics

Lifecycle & Tenure
Operating Age: 47.8 Yrs
Build Time: 9.3 Yrs
Lic. Remaining: 11.7 Yrs
Production & Power
Lifetime CF: 83.5%
Efficiency: 33.7%
Generated: 232.7 TWh
Reliability & Outages
Record Run: 565 Days
Refuelings: 17

Ownership & Construction

Owner/Operator: Indiana Michigan Power
Architect Engineer: AEP
Constructor: AEP

Technical Specs

Reactor Type: PWR
Containment: PWR-ICECND
NSS Supplier: WEST 4LP
Thermal Power: 3468 MWt
Net Capacity: 1168 MWe
Efficiency: 33.7%
Status: Operating

Licensing

Docket #: 05000316
License #: DPR-74
License Type: OL-FP
Const. Permit: 1969-03-25
Operating Lic: 1977-12-23
Commercial Op: 1978-07-01
License Renewed: 2005-08-30
License Exp: 2037-12-23

Facility Map

41.9754, -86.5652

Location & Contact

Address:
1 Cook Place
Bridgeman, MI 49106, USA
Get Directions
Phone: (269) 465-5901

Breaker-to-Breaker Runs 3 runs

?
Breaker-to-breaker runs measure continuous operation between refueling outages (470+ days). An active streak means the unit has been running continuously since the last refueling. Longer runs indicate better reliability.
497
Best Run (days)
2022-11-12 → 2024-03-23
488
Avg Run (days)
All Runs
2022-11-12 2024-03-23 497 days
2010-12-06 2012-03-21 471 days
2006-05-07 2007-09-15 496 days