Fermi 2 - Plant Information & Status

Technical specifications, contact data, ratings, and licensing history for the Fermi facility.

Current Reactor Status

?
Current power output from NRC daily reactor status reports. Shows the most recent power level as a percentage of rated capacity, along with a 14-day power history.

Ratings 60 votes

?
Community ratings from NukeWorker members. Vote to share your experience working at this facility. Results show the breakdown of Above Average, Average, and Below Average ratings.

Capacity Factor (365-Day)

0%
Current
95%
365-Day Avg
#66
of 94 plants
Min: 0% Max: 100% 13 days <80%

Scram History 9 events since 2011

9
Total
6
Automatic
3
Manual
11.4
Avg Recovery (days)
Recent Events
2024-03-22 Auto EN Revision Imported Date: 4/23/2024 EN Revision Text: AUTOM...
2022-06-23 Auto AUTOMATIC REACTOR SCRAM DUE TO MAIN TURBINE TRIP The followi...
2022-02-03 Auto EN Revision Imported Date: 3/4/2022 EN Revision Text: AUTOMA...
2018-04-13 Auto AUTOMATIC REACTOR SCRAM AND EMERGENCY CORE COOLING SYSTEM IN...
2015-09-12 Manual MANUAL SCRAM DUE TO LOSS OF TURBINE BUILDING CLOSED COOLING ...
2015-03-18 Auto AUTOMATIC REACTOR SCRAM DUE TO AN OSCILLATION POWER RANGE MO...
2012-11-06 Manual MANUAL REACTOR SHUTDOWN DUE TO HYDROGEN IN-LEAKAGE TO STATOR...
2012-09-13 Auto AUTOMATIC REACTOR SCRAM DUE TO THE LOSS OF THE 120 KV SWITCH...
+1 more events

Performance Charts

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.

Power History (12-Month)

?
Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.

Outage Timeline

?
Visual timeline of all recorded outages. Blue bars are scheduled refueling outages, red bars are forced/unplanned outages. Width represents outage duration. Hover for details.

Facility Statistics

Lifecycle & Tenure
Operating Age: 38.2 Yrs
Build Time: 15.3 Yrs
Lic. Remaining: 19 Yrs
Production & Power
Lifetime CF: 83.9%
Efficiency: 32.7%
Generated: 228.5 TWh
Reliability & Outages
Record Run: 685 Days
Refuelings: 17

Ownership & Construction

Owner/Operator: DTE Energy
Architect Engineer: S&L
Constructor: DANI

Technical Specs

Reactor Type: BWR
Containment: BWR-MARK 1
NSS Supplier: GE 4
Thermal Power: 3486 MWt
Net Capacity: 1141 MWe
Efficiency: 32.7%
Status: Operating

Licensing

Docket #: 05000341
License #: NPF-43
License Type: OL-FP
Const. Permit: 1972-09-26
Operating Lic: 1985-03-20
Commercial Op: 1988-01-23
License Renewed: 2016-12-15
License Exp: 2045-03-20

Facility Map

41.9636, -83.2581

Location & Contact

Address:
6400 North Dixie Highway
Monroe, MI 48162, USA
Get Directions
Phone: (313) 586-5300

Breaker-to-Breaker Runs 1 run

?
Breaker-to-breaker runs measure continuous operation between refueling outages (470+ days). An active streak means the unit has been running continuously since the last refueling. Longer runs indicate better reliability.
679
Best Run (days)
2024-05-13 → 2026-03-23
679
Avg Run (days)