Ratings 55 votes

?
Community ratings from NukeWorker members. Vote to share your experience working at this facility. Results show the breakdown of Above Average, Average, and Below Average ratings.

Capacity Factor (365-Day)

66%
Current
86.1%
365-Day Avg
#80
of 94 plants
Min: 0% Max: 100% 55 days <80%

Scram History 29 events since 2011

29
Total
15
Automatic
14
Manual
11.2
Avg Recovery (days)
Recent Events
2025-06-16 Manual MANUAL REACTOR SCRAM The following information was provided ...
2025-02-14 Manual MANUAL REACTOR SCRAM DUE TO DEGRADING CONDENSER VACUUM The f...
2024-11-09 Manual MANUAL REACTOR SCRAM The following information was provided ...
2023-12-15 Auto EN Revision Imported Date: 12/18/2023 EN Revision Text: AUTO...
2022-12-18 Manual MANUAL SCRAM DUE TO LOSS OF FEEDWATER PUMP The following inf...
2022-06-29 Manual EN Revision Imported Date: 7/1/2022 EN Revision Text: MANUAL...
2020-12-10 Auto AUTOMATIC REACTOR SCRAM DUE TO MAIN TURBINE / GENERATOR TRIP...
2020-11-05 Auto AUTOMATIC REACTOR SCRAM DUE TO TURBINE/GENERATOR TRIP "On No...
+21 more events

Performance Charts

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.

Power History (12-Month)

?
Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.

Outage Timeline

?
Visual timeline of all recorded outages. Blue bars are scheduled refueling outages, red bars are forced/unplanned outages. Width represents outage duration. Hover for details.

Facility Statistics

Lifecycle & Tenure
Operating Age: 40.8 Yrs
Build Time: 10.8 Yrs
Lic. Remaining: 18.6 Yrs
Production & Power
Lifetime CF: 83.3%
Efficiency: 31.8%
Generated: 278.6 TWh
Reliability & Outages
Record Run: 742 Days
Refuelings: 15

Ownership & Construction

Owner/Operator: Entergy
Architect Engineer: BECH
Constructor: BECH

Technical Specs

Reactor Type: BWR
Containment: BWR-MARK 3
NSS Supplier: GE 6
Thermal Power: 4408 MWt
Net Capacity: 1401 MWe
Efficiency: 31.8%
Status: Operating

Licensing

Docket #: 05000416
License #: NPF-29
License Type: OL-FP
Const. Permit: 1974-09-04
Operating Lic: 1984-11-01
Commercial Op: 1985-07-01
License Renewed: 2016-12-01
License Exp: 2044-11-01

Facility Map

32.0083, -91.0492

Location & Contact

Address:
7003 Bald Hill Road
Port Gibson, MS 39150, USA
Get Directions
Phone: (601) 437-2800

Breaker-to-Breaker Runs 1 run

?
Breaker-to-breaker runs measure continuous operation between refueling outages (470+ days). An active streak means the unit has been running continuously since the last refueling. Longer runs indicate better reliability.
633
Best Run (days)
2010-05-28 → 2012-02-20
633
Avg Run (days)