NukeWorker Menu

North Anna 2 - Plant Information & Status

Technical specifications, contact data, ratings, and licensing history for the North Anna facility.

Ratings

?
Community ratings from NukeWorker members. Vote to share your experience working at this facility. Results show the breakdown of Above Average, Average, and Below Average ratings.
No ratings yet for this facility.

Capacity Factor (365-Day)

100%
Current
99.3%
365-Day Avg
#24
of 94 plants
Min: 0% Max: 100% 4 days <80%

Scram History 7 events since 2011

7
Total
2
Automatic
5
Manual
13.3
Avg Recovery (days)
Recent Events
2022-08-26 Manual TURBINE TRIP DUE TO MAIN TRANSFORMER FIRE The following info...
2019-03-01 Manual MANUAL REACTOR TRIP DUE TO DEGRADING MAIN CONDENSER VACUUM"O...
2014-02-01 Manual MANUAL REACTOR TRIP FOLLOWING LOSS OF THE "A" MAIN FEEDWATER...
2013-05-27 Manual MANUAL REACTOR TRIP DUE TO A FEEDWATER TRANSIENT "On May 28,...
2013-05-09 Manual MANUAL REACTOR TRIP DUE TO HIGH TURBINE BEARING VIBRATION "O...
2012-10-23 Auto AUTOMATIC REACTOR TRIP ON LOW STEAM GENERATOR WATER LEVEL AN...
2011-08-22 Auto ALERT DECLARED DUE TO AN EARTHQUAKE IN THE AREA AND A LOSS O...

Performance Charts

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.

Power History (12-Month)

?
Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.

Outage Timeline

?
Visual timeline of all recorded outages. Blue bars are scheduled refueling outages, red bars are forced/unplanned outages. Width represents outage duration. Hover for details.

Facility Statistics

Lifecycle & Tenure
Operating Age: 45.3 Yrs
Build Time: 9.8 Yrs
Lic. Remaining: 14.4 Yrs
Production & Power
Lifetime CF: 89.2%
Efficiency: 32.1%
Generated: 201.0 TWh
Reliability & Outages
Record Run: 524 Days
Refuelings: 18

Ownership & Construction

Owner/Operator: Dominion Energy
Architect Engineer: S&W
Constructor: S&W

Technical Specs

Reactor Type: PWR
Containment: PWR-DRYSUB
NSS Supplier: WEST 3LP
Thermal Power: 2940 MWt
Net Capacity: 944 MWe
Efficiency: 32.1%
Status: Operating

Licensing

Docket #: 05000339
License #: NPF-7
License Type: OL-FP
Const. Permit: 1971-02-19
Operating Lic: 1980-08-21
Commercial Op: 1980-12-14
License Renewed: 2003-03-20
License Exp: 2040-08-21

Facility Map

38.0596, -77.7932

Location & Contact

Address:
1024 Haley Drive End of Route 700
Mineral, VA 23117, USA
Get Directions
Phone: (540) 894-5151

Breaker-to-Breaker Runs 2 runs

?
Breaker-to-breaker runs measure continuous operation between refueling outages (470+ days). An active streak means the unit has been running continuously since the last refueling. Longer runs indicate better reliability.
512
Best Run (days)
2014-10-11 → 2016-03-06
508
Avg Run (days)
All Runs
2020-10-19 2022-03-06 503 days
2014-10-11 2016-03-06 512 days