NukeWorker Menu

Robinson 2 - Plant Information & Status

Technical specifications, contact data, ratings, and licensing history for the H.B. Robinson facility.

Ratings 24 votes

?
Community ratings from NukeWorker members. Vote to share your experience working at this facility. Results show the breakdown of Above Average, Average, and Below Average ratings.

Capacity Factor (365-Day)

100%
Current
99.5%
365-Day Avg
#26
of 94 plants
Min: 17% Max: 100% 2 days <80%

Scram History 8 events since 2011

8
Total
8
Automatic
0
Manual
2.5
Avg Recovery (days)
Recent Events
2023-06-21 Auto EN Revision Imported Date: 6/27/2023 EN Revision Text: AUTOM...
2019-08-10 Auto AUTOMATIC REACTOR TRIP DUE TO TURBINE TRIP "At 0840 EDT, on ...
2016-10-07 Auto UNUSUAL EVENT DECLARED DUE TO LOSS OF OFFSITE POWER "UE SU1....
2016-08-23 Auto REACTOR TRIP DUE AUTOMATIC TURBINE TRIP FROM 100 PERCENT POW...
2014-01-08 Auto AUTOMATIC REACTOR TRIP DUE TO TURBINE TRIP "At 2234 hours ES...
2013-11-04 Auto AUTOMATIC REACTOR TRIP DUE TO MOMENTARY LOSS OF 4 KV BUSES A...
2012-03-27 Auto AUTOMATIC REACTOR TRIP DUE TO STEAM GENERATOR HIGH WATER LEV...
2011-09-25 Auto AUTOMATIC REACTOR TRIP DUE TO ONE LOOP LOW FLOW SIGNAL "At 1...

Performance Charts

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.

Power History (12-Month)

?
Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.

Outage Timeline

?
Visual timeline of all recorded outages. Blue bars are scheduled refueling outages, red bars are forced/unplanned outages. Width represents outage duration. Hover for details.

Facility Statistics

Lifecycle & Tenure
Operating Age: 55.1 Yrs
Build Time: 3.9 Yrs
Lic. Remaining: 4.3 Yrs
Production & Power
Lifetime CF: 89.6%
Efficiency: 32.4%
Generated: 162.4 TWh
Reliability & Outages
Record Run: 714 Days
Refuelings: 16

Ownership & Construction

Owner/Operator: Duke Energy
Architect Engineer: EBSO
Constructor: EBSO

Technical Specs

Reactor Type: PWR
Containment: PWR-DRYAMB
NSS Supplier: WEST 3LP
Thermal Power: 2339 MWt
Net Capacity: 759 MWe
Efficiency: 32.4%
Status: Operating

Licensing

Docket #: 05000261
License #: DPR-23
License Type: OL-FP
Const. Permit: 1967-04-13
Operating Lic: 1970-07-31
Commercial Op: 1971-03-07
License Renewed: 2004-04-19
License Exp: 2030-07-31

Facility Map

34.4014, -80.1578

Location & Contact

Address:
3581 West Entrance Road
Hartsville, SC 29550, USA
Get Directions
Phone: (803) 857-1000

Breaker-to-Breaker Runs 6 runs

?
Breaker-to-breaker runs measure continuous operation between refueling outages (470+ days). An active streak means the unit has been running continuously since the last refueling. Longer runs indicate better reliability.
482
Active Streak (days)
Since 2024-12-07
531
Best Run (days)
2012-04-01 → 2013-09-14
514
Avg Run (days)
All Runs
2024-12-07 Active 482 days
2023-06-25 2024-11-05 499 days
2012-04-01 2013-09-14 531 days
2007-05-18 2008-09-26 497 days
2002-11-14 2004-04-20 523 days
2001-05-12 2002-10-12 518 days