Surry 2 - Plant Information & Status

Technical specifications, contact data, ratings, and licensing history for the Surry facility.

Ratings 44 votes

?
Community ratings from NukeWorker members. Vote to share your experience working at this facility. Results show the breakdown of Above Average, Average, and Below Average ratings.

Capacity Factor (365-Day)

100%
Current
100%
365-Day Avg
#3
of 94 plants
Min: 100% Max: 100% 0 days <80%

Scram History 5 events since 2011

5
Total
5
Automatic
0
Manual
3
Avg Recovery (days)
Recent Events
2016-10-08 Auto AUTOMATIC REACTOR TRIP FOLLOWING MAIN GENERATOR DIFFERENTIAL...
2015-07-20 Auto SURRY UNIT 2 TRIP DURING REACTOR STARTUP "Unit 2 Reactor aut...
2014-10-12 Auto AUTOMATIC REACTOR TRIP DUE TO A SPURIOUS OVERPOWER / DELTA T...
2011-04-15 Auto UNUSUAL EVENT DECLARED DUE TO LOSS OF ALL OFFSITE POWER FROM...
2011-02-01 Auto AUTOMATIC REACTOR TRIP DUE TO LOSS OF RCS COOLANT FLOW IN ON...

Performance Charts

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.

Power History (12-Month)

?
Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.

Outage Timeline

?
Visual timeline of all recorded outages. Blue bars are scheduled refueling outages, red bars are forced/unplanned outages. Width represents outage duration. Hover for details.

Facility Statistics

Lifecycle & Tenure
Operating Age: 52.9 Yrs
Build Time: 4.8 Yrs
Lic. Remaining: 26.8 Yrs
Production & Power
Lifetime CF: 91.2%
Efficiency: 32.4%
Generated: 182.4 TWh
Reliability & Outages
Record Run: 530 Days
Refuelings: 18

Ownership & Construction

Owner/Operator: Dominion Energy
Architect Engineer: S&W
Constructor: S&W

Technical Specs

Reactor Type: PWR
Containment: PWR-DRYSUB
NSS Supplier: WEST 3LP
Thermal Power: 2587 MWt
Net Capacity: 838 MWe
Efficiency: 32.4%
Status: Operating

Licensing

Docket #: 05000281
License #: DPR-37
License Type: OL-FP
Const. Permit: 1968-06-25
Operating Lic: 1973-01-29
Commercial Op: 1973-05-01
License Renewed: 2003-03-20
License Exp: 2053-01-29

Facility Map

37.1675, -76.6972

Location & Contact

Address:
5570 Hog Island Road
Surry, VA 23883, USA
Get Directions
Phone: (757) 365-2000

Breaker-to-Breaker Runs 10 runs

?
Breaker-to-breaker runs measure continuous operation between refueling outages (470+ days). An active streak means the unit has been running continuously since the last refueling. Longer runs indicate better reliability.
481
Active Streak (days)
Since 2024-12-08
529
Best Run (days)
2008-05-21 → 2009-11-01
509
Avg Run (days)
All Runs
2024-12-08 Active 481 days
2023-06-15 2024-10-27 500 days
2021-12-03 2023-04-23 506 days
2020-06-04 2021-10-24 507 days
2018-12-07 2020-05-03 513 days
2017-06-05 2018-10-27 509 days
2011-06-27 2012-11-01 493 days
2008-05-21 2009-11-01 529 days
2006-11-21 2008-04-27 523 days
2005-05-24 2006-10-08 502 days