Ratings 35 votes

?
Community ratings from NukeWorker members. Vote to share your experience working at this facility. Results show the breakdown of Above Average, Average, and Below Average ratings.

Capacity Factor (365-Day)

94%
Current
81.7%
365-Day Avg
#93
of 94 plants
Min: 0% Max: 99% 48 days <80%

Scram History 10 events since 2011

10
Total
8
Automatic
2
Manual
2.6
Avg Recovery (days)
Recent Events
2024-06-15 Auto AUTOMATIC REACTOR TRIP The following information was provide...
2024-03-20 Auto EN Revision Imported Date: 3/28/2024 EN Revision Text: NOTIF...
2024-03-15 Manual MANUAL REACTOR TRIP DUE TO MAIN FEEDWATER AND MAIN STEAM ISO...
2022-06-23 Auto EN Revision Imported Date: 6/27/2022 EN Revision Text: AUTOM...
2020-11-01 Auto AUTOMATIC REACTOR TRIP DUE TO CONTROL ELEMENT DRIVE MECHANIS...
2019-05-15 Auto AUTOMATIC REACTOR TRIP DUE TO TURBINE TRIP "This is a non-em...
2017-07-16 Auto UNUSUAL EVENT DECLARED DUE TO LOSS OF OFFSITE POWER During a...
2015-10-02 Auto AUTOMATIC REACTOR TRIP "At 2307 CDT Waterford 3 experienced ...
+2 more events

Performance Charts

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.

Power History (12-Month)

?
Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.

Outage Timeline

?
Visual timeline of all recorded outages. Blue bars are scheduled refueling outages, red bars are forced/unplanned outages. Width represents outage duration. Hover for details.

Facility Statistics

Lifecycle & Tenure
Operating Age: 40.5 Yrs
Build Time: 10.9 Yrs
Lic. Remaining: 18.7 Yrs
Production & Power
Lifetime CF: 86.9%
Efficiency: 31.4%
Generated: 241.8 TWh
Reliability & Outages
Record Run: 583 Days
Refuelings: 18

Ownership & Construction

Owner/Operator: Entergy
Architect Engineer: EBSO
Constructor: EBSO

Technical Specs

Reactor Type: PWR
Containment: PWR-DRYAMB
NSS Supplier: COMB CE
Thermal Power: 3716 MWt
Net Capacity: 1165 MWe
Efficiency: 31.4%
Status: Operating

Licensing

Docket #: 05000382
License #: NPF-38
License Type: OL-FP
Const. Permit: 1974-11-14
Operating Lic: 1985-03-16
Commercial Op: 1985-09-24
License Renewed: 2018-12-27
License Exp: 2044-12-18

Facility Map

29.9874, -90.4449

Location & Contact

Address:
17265 River Road
Kilona, LA 70057, USA
Get Directions
Phone: (504) 464-3100

Breaker-to-Breaker Runs 3 runs

?
Breaker-to-breaker runs measure continuous operation between refueling outages (470+ days). An active streak means the unit has been running continuously since the last refueling. Longer runs indicate better reliability.
521
Best Run (days)
2017-08-02 → 2019-01-05
506
Avg Run (days)
All Runs
2017-08-02 2019-01-05 521 days
2009-12-05 2011-04-06 487 days
2003-11-23 2005-04-17 511 days