Help | Contact Us
NukeWorker.com
NukeWorker Menu

Nuclear Pictures

NukeWorker online photo album.

Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.
The Pilot Plant was the first plant to go on line at Fernald. The plant served as an operating prototype for all phases of the uranium metal production process and a training area for new operators. Later, the plant's main function became the conversion of uranium hexaflouride (UF6) to uranium tetraflouride (UF4), called green salt, for use in the metal production process. Workers also purified thorium and converted thorium nitrate to thoria gel oxides in the plant. The D&D of the plants consists of surface decontamination, building and equipment dismantlement, size reduction of building material and the loading of demolition debris into rolloff boxes for transfer to the On-Site Disposal Facility. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)

Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.

The Pilot Plant was the first plant to go on line at Fernald. The plant served as an operating prototype for all phases of the uranium metal production process and a training area for new operators. Later, the plant's main function became the conversion of uranium hexaflouride (UF6) to uranium tetraflouride (UF4), called green salt, for use in the metal production process. Workers also purified thorium and converted thorium nitrate to thoria gel oxides in the plant. The D&D of the plants consists of surface decontamination, building and equipment dismantlement, size reduction of building material and the loading of demolition debris into rolloff boxes for transfer to the On-Site Disposal Facility.

Silo 3 Project.jpg Quad_Cities_VFR.jpg Fernald Topples Last Uranium Production Building.jpg 12-13-07_0711.jpg l_5518f78194050c8a9cda188bc90e7e7d.jpg
File information
Filename:Fernald Topples Last Uranium Production Building.jpg
Album name:Rennhack / Fernald (FEMP)
Keywords:Fernald / Closure / Project / Fernald / Green / Salt / Plant, / Feed / Materials / Production / Center, / Fernald, / Ohio / (FEMP)
Date:Apr-30-2004
Credits:DOE Photo
Filesize:1281 KiB
Date added:Mar 13, 2005
Dimensions:1750 x 1250 pixels
Displayed:913 times
Resolution Unit:Inch
Y Resolution:250 dots per ResolutionUnit
URL:https://www.nukeworker.com/pictures/displayimage.php?pid=2834
Favorites:Add to Favorites


NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2024 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?