NukeWorker.com: Nuclear Jobs, Resumes, Outage Schedules, & RCT Training

NukeWorker Menu

Other Services

Outage Schedules Gold Member Study Guides Upload Picture View Pictures Calendar Quiz Help Search for User

Nuclear Pictures

NukeWorker online photo album.

An Iron Worker Installs Rebar at Valve House 7.
A balanced approach to waste disposition has been developed at Fernald, one in which the majority of the site's contaminated material will be placed in an On-Site Disposal Facility (OSDF) for its final disposition, where as, a smaller volume of more highly contaminated waste will be sent off site. The OSDF is being constructed on the east side of the Fernald Site and will ulimately hold approximately 2.5 million cubic yards of impacted material. The facility is being constructed in phases. Phase V consists of waste placement in Cells 3, 4, 5 and 6, construction of the Cell 7 and 8 liners, the placement of the final cover on all remaining cells and screening of clay liner and cover material in the Borrow Area. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)

An Iron Worker Installs Rebar at Valve House 7.

A balanced approach to waste disposition has been developed at Fernald, one in which the majority of the site's contaminated material will be placed in an On-Site Disposal Facility (OSDF) for its final disposition, where as, a smaller volume of more highly contaminated waste will be sent off site. The OSDF is being constructed on the east side of the Fernald Site and will ulimately hold approximately 2.5 million cubic yards of impacted material. The facility is being constructed in phases. Phase V consists of waste placement in Cells 3, 4, 5 and 6, construction of the Cell 7 and 8 liners, the placement of the final cover on all remaining cells and screening of clay liner and cover material in the Borrow Area.

fernald_DnD_1.jpg fernald_cells_5.jpg fernald_cells_2.jpg 2012981.jpg 2012963.jpg
File information
Filename:fernald_cells_2.jpg
Album name:Rennhack / Fernald (FEMP)
Keywords:Fernald / Closure / Project / Fernald / Green / Salt / Plant, / Feed / Materials / Production / Center, / Fernald, / Ohio / (FEMP)
Date:Apr-30-2004
Credits:DOE Photo
Filesize:57 KiB
Date added:Oct 30, 2005
Dimensions:288 x 192 pixels
Displayed:1203 times
URL:https://www.nukeworker.com/pictures/displayimage.php?pid=3976
Favorites:Add to Favorites