Operating Engineers use Shears to Cut Away Sections of Plant 8.
Plant 8, the Scrap Recovery Plant, recycled residues and scrap from the uranium production process. Ores, concentrates and process residues were roasted to oxidize the impurities and then filtered. The filtered material was converted to free flowing powder and transferred to Plant 2 for further processing. The D&D of the plants consists of surface decontamination, building and equipment dismantlement, size reduction of building material and the loading of demolition debris into rolloff boxes for transfer on the On-Site Disposal Facility. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)
Photo details
Filename
fernald_DnD_12.jpg
Album name
Rennhack / Fernald (FEMP)
Rating (1 votes)
55555
Date
Feb-29-2004
Filesize
53 KiB
Date added
Oct 30, 2005
Dimensions
288 x 192 pixels
Displayed
1461 times
Favorites
Add to Favorites