Workers Install Insulation on Piping in the TTA Building.
8,900 cubic yards of high activity low-level waste material will be removed from Silos 1 and 2, processed and shipped off site for disposal. This material was generated from 1951 and 1960 as a waste by-product from the processing of high-grade uranium ores. The Silos 1 and 2 material, also known as K-65 materials, contains radium and thorium radionuclides. Waste Retrieval Project will consist of six major systems; Silos Waste Retrieval System; Decant Sump Waste Retrieval System; Transfer Tank Area; Transfer Tank Waste Retrieval System; Radon Control System; and the Full Scale Mock-up System. Once the waste is removed from the silos it will then be stabilized with a formulation of flyash and Portland cement before being containerized for shipment. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)
Photo details
Filename
fernald_DnD_9.jpg
Album name
Rennhack / Fernald (FEMP)
Date
Mar-31-2004
Filesize
57 KiB
Date added
Oct 30, 2005
Dimensions
288 x 192 pixels
Displayed
1493 times
Favorites
Add to Favorites