Help | Contact Us
NukeWorker.com
NukeWorker Menu

Nuclear Pictures

NukeWorker online photo album.


2012189.jpg
2012181.jpg
2012183.jpg
2012184.jpg
2012180.jpg
2012179.jpg
2012182.jpg
2012177.jpg
2012168.jpg
2012175.jpg
2012172.jpg
2012173.jpg
2012176.jpg
2012174.jpg
2012169.jpg
2012171.jpg
2012164.jpg
2012163.jpg
2012161.jpg
2012162.jpg
2012160.jpg
2011663.jpg
2012033.jpg
2011662.jpg
2011415.jpg
2012159.jpg
2011666.jpg
2011414.jpg
fernald_silo_11.jpg
Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.
fernald_silo_9.jpg
Workers are Trained how to Operate the Silo 3 Excavator.
fernald_silo_10.jpg
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.
fernald_silo_8.jpg
Silo 3 Treatment Facility
fernald_silo_4.jpg
Fernald Silo 3 Project - Shipping Preparations
fernald_silo_7.jpg
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.
fernald_silo_6.jpg
Fernald Silo 3 Project - Shipping Preparations
fernald_silo_2.jpg
Fernald Silo 3 Project - Waste Packaging
fernald_llrw_5.jpg
fernald_silo_5.jpg
Fernald Silo 3 Project - Shipping Container
fernald_silo_1.jpg
Fernald Silo 3 Project - Waste Retrieval
fernald_llrw_3.jpg
fernald_llrw_2.jpg
fernald_llrw_4.jpg
fernald_llrw.jpg
fernald_DnD_14.jpg
Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).
fernald_DnD_11.jpg
An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.
fernald_DnD_13.jpg
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.
fernald_DnD_12.jpg
Operating Engineers use Shears to Cut Away Sections of Plant 8.
fernald_DnD_8.jpg
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.
fernald_DnD_9.jpg
Workers Install Insulation on Piping in the TTA Building.
fernald_DnD_10.jpg
Electricians Install Various Sizes of Conduit in the Electrical Room.
fernald_DnD_6.jpg
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.
fernald_DnD_7.jpg
Plants 2, 3 and 8 After Demolition.
fernald_DnD_5.jpg
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.
fernald_DnD_4.jpg
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.
fernald_DnD_0.jpg
Early Demolition Stages of Plants 2, 3 and 8.
fernald_cells_6.jpg
Operating Engineers use Grapplers and Bulldozers to Place and Compact Demolition Debris in Cell 4 of the On-Site Disposal Facility (OSDF).
fernald_cells_3.jpg
Two Crews Work to Remove Waste Material from Pit 2.
fernald_cells_4.jpg
A Supervisor Gives Instructions to an Operating Engineer in Pit 3.
fernald_DnD_2.jpg
Fernald's K-65 Silos are Gone.
fernald_DnD_1.jpg
The Decontamination and Demolition Project Work Scope Includes the Dismantlement of 259 Former Production Plants, Support Structures and Associated Components.
fernald_cells_5.jpg
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).
fernald_cells_2.jpg
An Iron Worker Installs Rebar at Valve House 7.
2012981.jpg
An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.
2012963.jpg
A Teamster Places Impacted Material Around Demolition Debris in Cell 4 of the On-Site Disposal Facility.
fernald_cells_1.jpg
Workers Expose the Cell 6 Liner to Prepare the Surface for Attachment to the Cell 7 Liner.
2012965.jpg
Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.
2012983.jpg
A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.
2012978.jpg
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.
2012964.jpg
Workers Topple the Bulk Lime Handling Building.
2012969.jpg
Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.
2012962.jpg
Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.
3.jpg
Fernald Silo 3 Project - Waste Packaging Station
fernald_map_bw.jpg
Fermald Map
fernald_map_canceptial_future_use.jpg
Conceptual Image
fernald_map.jpg
Fernald Map
femp_fig1.jpg
Fernald Environmental Project (FEMP)
fernald-map1.jpg
Fernald Environmental Project (FEMP)
fernald-map2.jpg
Fernald Environmental Project (FEMP)
fernald-map3.jpg
Fernald
Decontamination & Demolition.jpg
Decontamination & Demolition
167 files on 3 page(s) 2



NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2024 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?