Last viewed - Nuclear Facilities
|

891 viewsDec 05, 2025 at 04:40 AM
|
|

A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.954 viewsDec 05, 2025 at 04:40 AM
|
|

An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.772 viewsDec 05, 2025 at 04:40 AM
|
|

811 viewsDec 05, 2025 at 04:40 AM
|
|

Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.807 viewsDec 05, 2025 at 04:40 AM
|
|

822 viewsDec 05, 2025 at 04:40 AM
|
|

823 viewsDec 05, 2025 at 04:40 AM
|
|

Fernald Silo 3 Project - Waste Retrieval924 viewsDec 05, 2025 at 04:40 AM
|
|

769 viewsDec 05, 2025 at 04:40 AM
|
|

819 viewsDec 05, 2025 at 04:40 AM
|
|

Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.769 viewsDec 05, 2025 at 04:40 AM
|
|

893 viewsDec 05, 2025 at 04:40 AM
|
|

Fernald852 viewsDec 05, 2025 at 04:40 AM
|
|

786 viewsDec 05, 2025 at 04:40 AM
|
|

892 viewsDec 05, 2025 at 04:40 AM
|
|

Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.1332 viewsDec 05, 2025 at 04:40 AM
|
|

1057 viewsDec 05, 2025 at 04:40 AM
|
|

Back to Fernald1137 viewsDec 05, 2025 at 04:40 AM
|
|

Fernald Environmental Project (FEMP)812 viewsDec 05, 2025 at 04:39 AM
|
|

A Supervisor Gives Instructions to an Operating Engineer in Pit 3.819 viewsDec 05, 2025 at 04:39 AM
|
|

828 viewsDec 05, 2025 at 04:39 AM
|
|

A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).838 viewsDec 05, 2025 at 04:39 AM
|
|

Electricians Install Various Sizes of Conduit in the Electrical Room.876 viewsDec 05, 2025 at 04:39 AM
|
|

Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.814 viewsDec 05, 2025 at 04:39 AM
|
|

791 viewsDec 05, 2025 at 04:39 AM
|
|

834 viewsDec 05, 2025 at 04:39 AM
|
|

Fernald's K-65 Silos are Gone.847 viewsDec 05, 2025 at 04:39 AM
|
|

832 viewsDec 05, 2025 at 04:39 AM
|
|

Fernald Silo 3 Project - Shipping Preparations837 viewsDec 05, 2025 at 04:39 AM
|
|

830 viewsDec 05, 2025 at 04:39 AM
|
|

Fernald Feed Materials Production Center1077 viewsDec 05, 2025 at 04:39 AM
|
|

794 viewsDec 05, 2025 at 04:39 AM
|
|

776 viewsDec 05, 2025 at 04:39 AM
|
|

814 viewsDec 05, 2025 at 04:39 AM
|
|

Waste Pits Project1076 viewsDec 05, 2025 at 04:39 AM
|
|

760 viewsDec 05, 2025 at 04:39 AM
|
|

739 viewsDec 05, 2025 at 04:39 AM
|
|

Silos 1 and 2 Project1043 viewsDec 05, 2025 at 04:39 AM
|
|

830 viewsDec 05, 2025 at 04:39 AM
|
|

945 viewsDec 05, 2025 at 04:39 AM
|
|

791 viewsDec 05, 2025 at 04:39 AM
|
|

983 viewsDec 05, 2025 at 04:39 AM
|
|

Cooling the Derby1148 viewsDec 05, 2025 at 04:39 AM
|
|

871 viewsDec 05, 2025 at 04:39 AM
|
|

Two Crews Work to Remove Waste Material from Pit 2.773 viewsDec 05, 2025 at 04:39 AM
|
|

Silo 3 Project999 viewsDec 05, 2025 at 04:39 AM
|
|

785 viewsDec 05, 2025 at 04:39 AM
|
|

813 viewsDec 05, 2025 at 04:39 AM
|
|

737 viewsDec 05, 2025 at 04:39 AM
|
|

904 viewsDec 05, 2025 at 04:39 AM
|
|

Workers are Trained how to Operate the Silo 3 Excavator.888 viewsDec 05, 2025 at 04:39 AM
|
|

978 viewsDec 05, 2025 at 04:39 AM
|
|

Fernald Environmental Project (FEMP)843 viewsDec 05, 2025 at 04:39 AM
|
|

915 viewsDec 05, 2025 at 04:39 AM
|
|

Mound1440 viewsDec 05, 2025 at 04:39 AM
|
|

Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.1352 viewsDec 05, 2025 at 04:39 AM
|
|

Ecological Restoration912 viewsDec 05, 2025 at 04:39 AM
|
|

Workers Topple the Bulk Lime Handling Building.1116 viewsDec 05, 2025 at 04:39 AM
|
|

906 viewsDec 05, 2025 at 04:39 AM
|
|

Fernald Environmental Project (FEMP)825 viewsDec 05, 2025 at 04:39 AM
|
|

Decontamination & Demolition966 viewsDec 05, 2025 at 04:39 AM
|
|

790 viewsDec 05, 2025 at 04:39 AM
|
|

Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.868 viewsDec 05, 2025 at 04:39 AM
|
|

885 viewsDec 05, 2025 at 04:39 AM
|
|

751 viewsDec 05, 2025 at 04:39 AM
|
|

924 viewsDec 05, 2025 at 04:39 AM
|
|

781 viewsDec 05, 2025 at 04:39 AM
|
|

870 viewsDec 05, 2025 at 04:39 AM
|
|

897 viewsDec 05, 2025 at 04:39 AM
|
|

803 viewsDec 05, 2025 at 04:39 AM
|
|

769 viewsDec 05, 2025 at 04:39 AM
|
|

791 viewsDec 05, 2025 at 04:39 AM
|
|

Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).820 viewsDec 05, 2025 at 04:39 AM
|
|

Ingots of Fernald at Ashtabula1181 viewsDec 05, 2025 at 04:39 AM
|
|

Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.921 viewsDec 05, 2025 at 04:39 AM
|
|

923 viewsDec 05, 2025 at 04:39 AM
|
|

781 viewsDec 05, 2025 at 04:39 AM
|
|

Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.853 viewsDec 05, 2025 at 04:39 AM
|
|

774 viewsDec 05, 2025 at 04:39 AM
|
|

Plants 2, 3 and 8 After Demolition.768 viewsDec 05, 2025 at 04:39 AM
|
|
| 5098 files on 64 page(s) |
 |
 |
 |
 |
 |
54 |  |
 |
 |
 |
|