A Teamster Places Impacted Material Around Demolition Debris in Cell 4 of the On-Site Disposal Facility.1208 viewsMay 14, 2026 at 06:49 AM
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).1299 viewsMay 14, 2026 at 06:49 AM
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.1213 viewsMay 14, 2026 at 06:49 AM
Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.1264 viewsMay 14, 2026 at 06:49 AM
An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.1265 viewsMay 14, 2026 at 06:49 AM
Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.1347 viewsMay 14, 2026 at 06:49 AM
The Decontamination and Demolition Project Work Scope Includes the Dismantlement of 259 Former Production Plants, Support Structures and Associated Components.1207 viewsMay 14, 2026 at 06:49 AM
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.1358 viewsMay 14, 2026 at 06:49 AM
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.1226 viewsMay 14, 2026 at 06:49 AM
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.1277 viewsMay 14, 2026 at 06:49 AM
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.1320 viewsMay 14, 2026 at 06:49 AM
Operating Engineers Topple the Last Section of Plant 8 by Pushing the Structure to the Ground.1267 viewsMay 14, 2026 at 06:49 AM
An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.1223 viewsMay 14, 2026 at 06:49 AM