The Decontamination and Demolition Project Work Scope Includes the Dismantlement of 259 Former Production Plants, Support Structures and Associated Components.689 views
689 views
689 views
Section of Falls City perimeter fence leaning outward, located near perimeter sign P38 along688 views
688 views
688 views
Plants 2, 3 and 8 After Demolition.687 views
687 views
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.686 views
Durango Disposal Site Before Remedial Action686 views
686 views
685 views
685 views
685 views
684 views
An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.684 views
TECHNICIAN AT THE B FACTORY'S HUGE BABAR DETECTOR SYSTEM AT THE STANFORD LINEAR ACCELERATOR CENTER.684 views
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.676 views