TECHNICIAN AT THE B FACTORY'S HUGE BABAR DETECTOR SYSTEM AT THE STANFORD LINEAR ACCELERATOR CENTER.360 views
359 views
359 views
A Teamster Places Impacted Material Around Demolition Debris in Cell 4 of the On-Site Disposal Facility.359 views
359 views
359 views
358 views
358 views
358 views
358 views
358 views
357 views
An Electrician Verifies that One of the Motor Controls that will Operate a Piece of Equipment in the Silos 1 and 2 Treatment Facility Works Correctly.357 views
357 views
357 views
357 views
357 views
356 views
356 views
356 views
356 views
Colonie Map355 views
355 views
Fermald Map354 views
354 views
354 views
The Bio-Dentrification Tower and Plants 2 and 3 Prior to Demolition.353 views
353 views
353 views
Colonie FUSRAP Site Map353 views
352 views
Falls City Map352 views
Fernald Map352 views
The Decontamination and Demolition Project Work Scope Includes the Dismantlement of 259 Former Production Plants, Support Structures and Associated Components.352 views
352 views
351 views
Plants 2 and 3 Decontamination and Demolition Project - An Operating Engineer Uses a Shear to Size Reduce the Bulk Lime Handling Building.351 views
351 views
351 views
350 views
350 views
349 views
349 views
University of Chicago Site349 views
349 views
348 views
Two Crews Work to Remove Waste Material from Pit 2.347 views
An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.347 views
The Maybell uranium mill site is located 5 miles northeast of the town of Maybell in Moffat County, Colorado.347 views
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.343 views