An Operating Engineer Loads Building Debris into an Articulation Dump Truck on the Pad of the Lab Building.1264 views
Section of Falls City perimeter fence leaning outward, located near perimeter sign P38 along1261 views
The Bio-Dentrification Tower and Plants 2 and 3 After Demolition. Excavation Crews are Now Removing the Below-Grade Portions of the Structures.1258 views
TECHNICIAN AT THE B FACTORY'S HUGE BABAR DETECTOR SYSTEM AT THE STANFORD LINEAR ACCELERATOR CENTER.1257 views
A Teamster Places Impacted Material Around Demolition Debris in Cell 4 of the On-Site Disposal Facility.1246 views
The Decontamination and Demolition Project Work Scope Includes the Dismantlement of 259 Former Production Plants, Support Structures and Associated Components.1246 views