Prairie Island 2 - Plant Information & Status

Technical specifications, contact data, ratings, and licensing history for the Prairie Island facility.

Ratings 42 votes

?
Community ratings from NukeWorker members. Vote to share your experience working at this facility. Results show the breakdown of Above Average, Average, and Below Average ratings.

Capacity Factor (365-Day)

100%
Current
88.3%
365-Day Avg
#77
of 94 plants
Min: 0% Max: 100% 46 days <80%

Scram History 8 events since 2011

8
Total
6
Automatic
2
Manual
3.3
Avg Recovery (days)
Recent Events
2024-10-28 Auto AUTOMATIC REACTOR TRIP The following information was provide...
2024-03-02 Auto AUTOMATIC REACTOR TRIP DUE TO LOSS OF MAIN FEEDWATER PUMP SU...
2023-05-26 Auto NOTIFICATION OF UNUSUAL EVENT DUE TO MULTIPLE FIRE ALARMS IN...
2015-12-16 Auto UNUSUAL EVENT DECLARED DUE TO FIRE ALARM IN CONTAINMENT NOT ...
2015-06-06 Auto AUTOMATIC REACTOR TRIP RESULTING FROM TURBINE TRIP ON LOW OI...
2015-04-02 Manual MANUAL REACTOR SCRAM DUE TO LOSS OF MAIN FEEDWATER PUMP "On ...
2012-02-20 Manual MANUAL REACTOR TRIP DUE TO FEEDWATER HEATER HI HI ALARM "Dur...
2011-05-08 Auto AUTOMATIC REACTOR TRIP UPON TURBINE TRIP DUE TO MAIN GENERAT...

Performance Charts

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.

Power History (12-Month)

?
Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.

Outage Timeline

?
Visual timeline of all recorded outages. Blue bars are scheduled refueling outages, red bars are forced/unplanned outages. Width represents outage duration. Hover for details.

Facility Statistics

Lifecycle & Tenure
Operating Age: 51.3 Yrs
Build Time: 6.5 Yrs
Lic. Remaining: 8.6 Yrs
Production & Power
Lifetime CF: 88.5%
Efficiency: 30.9%
Generated: 109.6 TWh
Reliability & Outages
Record Run: 709 Days
Refuelings: 15

Ownership & Construction

Owner/Operator: Xcel Energy
Architect Engineer: FLUR
Constructor: NSP

Technical Specs

Reactor Type: PWR
Containment: PWR-DRYAMB
NSS Supplier: WEST 2LP
Thermal Power: 1677 MWt
Net Capacity: 519 MWe
Efficiency: 30.9%
Status: Operating

Licensing

Docket #: 05000306
License #: DPR-60
License Type: OL-FP
Const. Permit: 1968-06-25
Operating Lic: 1974-10-29
Commercial Op: 1974-12-21
License Renewed: 2011-06-27
License Exp: 2034-10-29

Facility Map

44.622, -92.6331

Location & Contact

Address:
1717 Wakonade Drive East
Welch, MN 55089, USA
Get Directions
Phone: (612) 388-1121

Breaker-to-Breaker Runs 7 runs

?
Breaker-to-breaker runs measure continuous operation between refueling outages (470+ days). An active streak means the unit has been running continuously since the last refueling. Longer runs indicate better reliability.
704
Best Run (days)
2019-10-29 → 2021-10-02
583
Avg Run (days)
All Runs
2019-10-29 2021-10-02 704 days
2017-11-21 2019-10-05 683 days
2016-02-24 2017-10-14 598 days
2012-05-30 2013-09-21 479 days
2008-11-03 2010-04-17 530 days
2007-04-09 2008-09-20 530 days
2002-03-03 2003-09-13 559 days