NukeWorker.com: Nuclear Jobs, Resumes, Outage Schedules, & RCT Training

NukeWorker Menu

Other Services

Outage Schedules Gold Member Study Guides Upload Picture View Pictures Calendar Quiz Help Search for User

Nuclear Pictures

NukeWorker online photo album.

A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.
The Analytical Laboratory housed the analytical, metallugical and chemical process laboratories and was divided into restricted and non-restricted areas. During Fernald's production era the facility was used to verify the uranium product quality. The laboratory used state of the art technology and various chemicals during the preparation and determination of the analytical result. More recently, the laboratory staff processed various samples associated with cleanup. The D&D of the Lab consists of asbestos abatement, building and equipment dismantlement, size reduction of building material and loading for transfer to the On-Site Disposal Facility. 
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)

A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.

The Analytical Laboratory housed the analytical, metallugical and chemical process laboratories and was divided into restricted and non-restricted areas. During Fernald's production era the facility was used to verify the uranium product quality. The laboratory used state of the art technology and various chemicals during the preparation and determination of the analytical result. More recently, the laboratory staff processed various samples associated with cleanup. The D&D of the Lab consists of asbestos abatement, building and equipment dismantlement, size reduction of building material and loading for transfer to the On-Site Disposal Facility.

2012965.jpg 2012983.jpg 2012978.jpg 2012964.jpg 2012969.jpg
File information
Filename:2012978.jpg
Album name:Rennhack / Fernald (FEMP)
Keywords:Fernald / Closure / Project / Fernald / Green / Salt / Plant, / Feed / Materials / Production / Center, / Fernald, / Ohio / (FEMP)
Date:Feb-29-2004
Credits:DOE Photo
Filesize:50 KiB
Date added:Oct 30, 2005
Dimensions:288 x 192 pixels
Displayed:1189 times
URL:https://www.nukeworker.com/pictures/displayimage.php?pid=3970
Favorites:Add to Favorites