Silos 1 and 2 Project
Remove 8,900 cubic yards of high activity low-level waste from two concrete silos. Chemically stabilize waste and ship off site for disposal.
Keywords: Fernald Closure Project Fernald Green Salt Plant, Feed Materials Production Center, Fernald, Ohio (FEMP)
Photo details
Filename
Silos 1 and 2 Project.jpg
Album name
Rennhack / Fernald (FEMP)
Filesize
624 KiB
Date added
Mar 13, 2005
Dimensions
900 x 600 pixels
Displayed
1666 times
Resolution Unit
Inch
Y Resolution
150 dots per ResolutionUnit
Favorites
Add to Favorites