Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.996 views
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).995 views
Fernald Environmental Project (FEMP)993 views
A Supervisor Gives Instructions to an Operating Engineer in Pit 3.993 views
991 views
Analytical Lab Decontamination and Demolition Project - An Operating Engineer uses Grapplers to Segregate Demolition Debris that Needs Further Size Reducing from that which can be Immediately Loaded for Transfer to the On-Site Disposal Facility (OSDF).987 views