Help | Contact Us
NukeWorker Logo
NukeWorker Logo
NukeWorker.com
NukeWorker Menu

Nuclear Pictures

NukeWorker online photo album.


Most viewed - Fernald (FEMP)
Public Tours.jpg
Public Tours2499 views
18.jpg
Sampling the Derby1592 views
14.jpg
Uranium Green Salt1528 views
Fernald Topples Last Uranium Production Building.jpg
Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.1510 views
2012168.jpg
1469 views
fernald_DnD_4.jpg
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.1451 views
25.jpg
Laundry1441 views
Water Treatment Bypass Process.jpg
Water Treatment Bypass Process1438 views
19.jpg
Ingots of Fernald at Ashtabula1361 views
813686730218b5422fbc5583.medium.jpg
1358 views
2009809.jpg
1341 views
2011140.jpg
1332 views
2009812.jpg
1317 views
17.jpg
Cooling the Derby1278 views
24.jpg
Back to Fernald1277 views
2012964.jpg
Workers Topple the Bulk Lime Handling Building.1252 views
15.jpg
Fernald Feed Materials Production Center1227 views
2011139.jpg
1221 views
2011665.jpg
1217 views
Waste Pits Project.jpg
Waste Pits Project1215 views
70.jpg
Gas into Metal1214 views
2012967.jpg
1212 views
2011664.jpg
1206 views
Silos 1 and 2 Project.jpg
Silos 1 and 2 Project1150 views
2012972.jpg
1143 views
Decontamination & Demolition.jpg
Decontamination & Demolition1126 views
Silo 3 Project.jpg
Silo 3 Project1121 views
2012974.jpg
1119 views
2012705.jpg
1109 views
2012983.jpg
A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.1107 views
2012966.jpg
1100 views
2012971.jpg
1096 views
2012772.jpg
1088 views
2008966.jpg
1088 views
fernald_cells_2.jpg
An Iron Worker Installs Rebar at Valve House 7.1079 views
2012970.jpg
1073 views
2012703.jpg
1071 views
fernald_silo_1.jpg
Fernald Silo 3 Project - Waste Retrieval1069 views
2012707.jpg
1069 views
Ecological Restoration.jpg
Ecological Restoration1065 views
2012702.jpg
1064 views
2011414.jpg
1059 views
2012973.jpg
1055 views
2012773.jpg
1054 views
2012968.jpg
1053 views
2012969.jpg
Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.1049 views
fernald_silo_2.jpg
Fernald Silo 3 Project - Waste Packaging1046 views
fernald_llrw_5.jpg
1045 views
2010147.jpg
1045 views
2012178.jpg
1041 views
fernald_DnD_0.jpg
Early Demolition Stages of Plants 2, 3 and 8.1038 views
2010136.jpg
1037 views
d6997bebc981dba6fdc3c603.medium.jpg
1034 views
fernald_DnD_10.jpg
Electricians Install Various Sizes of Conduit in the Electrical Room.1031 views
2012190.jpg
1025 views
2012704.jpg
1024 views
fernald_llrw_3.jpg
1023 views
fernald_silo_9.jpg
Workers are Trained how to Operate the Silo 3 Excavator.1023 views
fernald_DnD_8.jpg
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.1014 views
5ffaa93d84063721ae8440e5.medium.jpg
1014 views
2010146.jpg
1014 views
femp_fig1.jpg
Fernald Environmental Project (FEMP)1012 views
fernald_DnD_12.jpg
Operating Engineers use Shears to Cut Away Sections of Plant 8.1012 views
2012706.jpg
1010 views
fernald_DnD_2.jpg
Fernald's K-65 Silos are Gone.1006 views
2012978.jpg
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.1005 views
fernald_silo_8.jpg
Silo 3 Treatment Facility1004 views
2010141.jpg
1004 views
fernald_cells_6.jpg
Operating Engineers use Grapplers and Bulldozers to Place and Compact Demolition Debris in Cell 4 of the On-Site Disposal Facility (OSDF).999 views
fernald_silo_10.jpg
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.996 views
fernald_DnD_9.jpg
Workers Install Insulation on Piping in the TTA Building.991 views
fernald_silo_4.jpg
Fernald Silo 3 Project - Shipping Preparations991 views
2009811.jpg
987 views
fernald_silo_7.jpg
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.986 views
2008967.jpg
986 views
2012708.jpg
985 views
fernald_cells_4.jpg
A Supervisor Gives Instructions to an Operating Engineer in Pit 3.983 views
fernald_cells_5.jpg
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).982 views
fernald-map1.jpg
Fernald Environmental Project (FEMP)981 views
2012962.jpg
Operating Engineers Cover Demolition Debris from the Analytical Laboratory with Impacted Soil in Cell 4 of the On-Site Disposal Facility.975 views
167 files on 3 page(s) 1


NukeWorker ™ is a registered trademark of NukeWorker.com ™, LLC © 1996-2026 All rights reserved.
All material on this Web Site, including text, photographs, graphics, code and/or software, are protected by international copyright/trademark laws and treaties. Unauthorized use is not permitted. You may not modify, copy, reproduce, republish, upload, post, transmit or distribute, in any manner, the material on this web site or any portion of it. Doing so will result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law.
Privacy Statement | Terms of Use | Code of Conduct | Spam Policy | Advertising Info | Contact Us | Forum Rules | Password Problem?