Workers Install Insulation on Piping in the TTA Building.989 views
983 views
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.982 views
981 views
980 views
Fernald Environmental Project (FEMP)978 views
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).978 views
A Supervisor Gives Instructions to an Operating Engineer in Pit 3.978 views
Workers Finish Installing a Bridge Crane in the Silos 1 and 2 Treatment Facility that will be used to Load the Waste Containers for Transportation Off Site.971 views