Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.1098 views
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.1089 views
Water Treatment Bypass Process1035 views
Uranium Green Salt997 views
979 views
972 views
Laundry941 views
Ingots of Fernald at Ashtabula919 views
Cooling the Derby893 views
Back to Fernald886 views
Workers Topple the Bulk Lime Handling Building.861 views
850 views
843 views
Fernald Feed Materials Production Center822 views
Waste Pits Project820 views
819 views
Gas into Metal806 views
800 views
Silos 1 and 2 Project788 views
753 views
Silo 3 Project739 views
721 views
721 views
717 views
708 views
Decontamination & Demolition706 views
A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.696 views
696 views
695 views
695 views
688 views
683 views
680 views
674 views
Fernald Silo 3 Project - Waste Retrieval673 views
An Iron Worker Installs Rebar at Valve House 7.670 views
Fernald Silo 3 Project - Waste Packaging670 views
670 views
669 views
Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.666 views
Ecological Restoration664 views
660 views
651 views
647 views
645 views
636 views
635 views
631 views
629 views
629 views
628 views
Early Demolition Stages of Plants 2, 3 and 8.627 views
Workers are Trained how to Operate the Silo 3 Excavator.625 views
Electricians Install Various Sizes of Conduit in the Electrical Room.624 views
621 views
620 views
617 views
613 views
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.612 views
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.609 views
607 views
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.601 views
Operating Engineers use Shears to Cut Away Sections of Plant 8.597 views
596 views
Fernald594 views
Workers Install Insulation on Piping in the TTA Building.594 views
Fernald's K-65 Silos are Gone.592 views
592 views
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.590 views
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).588 views
Operating Engineers use Grapplers and Bulldozers to Place and Compact Demolition Debris in Cell 4 of the On-Site Disposal Facility (OSDF).582 views