Operating Engineers Raze the Last Section of the Pilot Plant. The Facility was the Last of 10 Plants to be Removed from the Fernald Skyline.1102 views
Workers Remove Transite Panels from the Pilot Plant in Preparation for the Demolition of the Concrete Structure.1093 views
Water Treatment Bypass Process1045 views
Uranium Green Salt1009 views
988 views
974 views
Laundry952 views
Ingots of Fernald at Ashtabula922 views
Cooling the Derby898 views
Back to Fernald890 views
Workers Topple the Bulk Lime Handling Building.867 views
860 views
856 views
828 views
Fernald Feed Materials Production Center826 views
Waste Pits Project823 views
Gas into Metal811 views
803 views
Silos 1 and 2 Project793 views
763 views
Silo 3 Project743 views
732 views
726 views
722 views
712 views
Decontamination & Demolition708 views
707 views
A Member of the Quality Assurance Group Watches as a Worker Installs a HEPA Filter at Silo 3.701 views
699 views
699 views
692 views
686 views
686 views
679 views
Fernald Silo 3 Project - Waste Retrieval675 views
An Iron Worker Installs Rebar at Valve House 7.674 views
674 views
673 views
Fernald Silo 3 Project - Waste Packaging672 views
Silos 1 and 2 Waste Retrieval Project - Iron Workers Assemble Waste Container Handling Equipment.671 views
Ecological Restoration667 views
664 views
655 views
650 views
649 views
639 views
639 views
639 views
638 views
633 views
633 views
Early Demolition Stages of Plants 2, 3 and 8.632 views
Electricians Install Various Sizes of Conduit in the Electrical Room.629 views
Workers are Trained how to Operate the Silo 3 Excavator.629 views
625 views
624 views
619 views
617 views
Work Continues in the Three Product Fill Rooms where the Casks will be Filled Robotically with the K-65 Stabilized Waste.616 views
Workers Remove Process Piping in the Pilot Plant as Part of the Demolition Process.612 views
611 views
A Supervisor and a Member of the Site's Waste Acceptance Organization Watch as Operating Engineers Shear a Section of the Analytical Lab.604 views
Operating Engineers use Shears to Cut Away Sections of Plant 8.602 views
598 views
Fernald597 views
Workers Install Insulation on Piping in the TTA Building.597 views
Fernald's K-65 Silos are Gone.596 views
595 views
Workers are Trained to Seal the Soft-Sided Packages that will be used for the Silo 3 Waste.593 views
A Member of the Waste Acceptance Organization Inspects a Section of Pipe Before Allowing Workers to Move it to the On-Site Disposal Facility (OSDF).591 views
587 views
Operating Engineers use Grapplers and Bulldozers to Place and Compact Demolition Debris in Cell 4 of the On-Site Disposal Facility (OSDF).586 views