Hartsville TN
Hartsville, TN
Working Here
Jobs in TN 72 active
Active nuclear industry job listings in TN from the NukeWorker job board. Click a job title for full details, or click the header to search all jobs in this state.
Per Diem Rates FY 2027
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
$113
Lodging/Night
$68
M&IE/Day
$181
Total/Day
Standard Rate, TN
Unemployment Benefits TN
Maximum state unemployment insurance benefits for TN. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$275
Max Weekly
26
Max Weeks
$7,150
Max Total
7-day waiting period before benefits begin
Photos
Photos of this facility from the NukeWorker photo gallery. Click the header or any photo to browse the full album.
Facility Map
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
36.3512, -86.0831
Location & Contact
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Plant Facts
About This Site
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Hartsville Nuclear Plant.
The Hartsville Nuclear Plant was a planned Tennessee Valley Authority station near Hartsville, in Trousdale County, Tennessee. It was designed around four General Electric BWR/6 boiling water reactors of about 1,233 MWe each, and it was never completed.
Read more
TVA began limited work in 1974 under early work permits, and full-scale construction followed in April 1977 after construction permits were issued. TVA cancelled the Plant B reactors on March 22, 1983, and shut down work on Plant A on August 29, 1984. At that point Unit A1 was about 44 percent complete, A2 about 34 percent, B1 about 17 percent and B2 about 7 percent.
Never completed: cancelled in 1984