LaSalle 2 — Nuclear Reactor Data & Live Status

Live reactor status, daily power data, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for LaSalle 2.

?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
79
Excellence
#6 of 93
Top Quartile
?
Current reactor power level from the most recent NRC daily report.
100%
Power
ONLINE
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
223
Current Run
days
#45 of 95
Mid Quartile
?
Longest recorded period of continuous operation between outages.
736
Record Run
days
#11 of 95
Top Quartile
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (626 days for this 24-month cycle unit) with no trips to 0% power.
5
B2B Runs
#41 of 86
Mid Quartile
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
92.7%
Capacity Factor
#17 of 95
Top Quartile
?
Net electricity actually generated over the most recent 12 months reported by the U.S. Energy Information Administration (Form EIA-923), summed across every unit at this plant. These are authoritative actuals, not an estimate.
18.63 TWh
Net Generation
EIA-923 · 12 mo to 2026-04 · plant total
?
Community rating score (Bayesian-adjusted). Based on 33 votes. Ranked against all rated facilities.
43
Rating
33 votes
#87 of 97
Bottom Quartile
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
6
Scrams
#38 of 94
Mid Quartile
?
Years since commercial operation began. License remaining: 17.4 years.
41.7
Operating Age
years
17.4 yrs remaining

Reactor Status Timeline

Online NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri), the current state, and what is coming: the utility's published Scheduled outage plus, for subscribers, NukeWorker's model Projection. Colored by status. How far ahead you can see depends on your plan.
Aug2025SepOctNovDecJan2026FebMarAprMayJunJulAugOnline: Jul 9, 2025 to Sep 27, 2025Reduced Power: Sep 28, 2025Online: Sep 29, 2025 to Nov 16, 2025Reduced Power: Nov 17, 2025 to Nov 18, 2025Forced Outage: Nov 19, 2025 to Nov 28, 2025Power Ascension: Nov 29, 2025 to Dec 2, 2025Online: Dec 3, 2025 to Apr 10, 2026Reduced Power: Apr 11, 2026 to Apr 18, 2026Online: Apr 19, 2026 to Apr 26, 2026Reduced Power: Apr 27, 2026Online: Apr 28, 2026 to Jul 9, 2026Today
OnlineReduced PowerPower AscensionForced Outage
Full history & analysis →
?
Composite Operational Excellence Score for LaSalle 2 — average percentile rank across 7 publicly observable metrics in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). Toggle the time window (3yr / 5yr / Lifetime) to see how this unit's standing shifts. Each dimension percentile-ranked across the active US fleet. Sub-score = average of components. Composite = average of the three sub-scores.

NukeWorker's Operational Excellence Score 5-yr composite · ranks 6 of 93

NukeWorker scores LaSalle 2's operational excellence at 79 out of 100 over the past five years, ranking it 6 of 93 reactors in the active US fleet. The score blends reliability, efficiency, and operating discipline drawn from public performance data.
Time window
NukeWorker's
Operational
Excellence Score
79/100
Top Quartile · #6/93
5-year window

LaSalle 2 ranks #6 of 93 active US units on NukeWorker's Operational Excellence Score over the 5-year window. Strongest area: Fuel Utilization (98th percentile). Weakest: Forced Outage Days/yr (52th percentile).

Reliability
69
Capacity factor + Forced outages + B2B streaks
Efficiency
90
Fuel utilization + Refuel duration
Discipline
78
Startup duration + Scram count
Cohort Rankings apples-to-apples comparison within each peer group
Reactor type: #3 of 31 BWR
Containment: #2 of 8 Mark II (BWR)
Cycle length: #4 of 40 24-month cycle
Fleet rank above (6 of 93) compares all active US units; cohort ranks compare only against units sharing this property.
Per-dimension breakdown (7 metrics)
Capacity Factor 67th
93.5% (higher better, Reliability)
Forced Outage Days/yr 52th
3.2d (lower better, Reliability)
B2B Avg Streak 87th
702d (higher better, Reliability)
Fuel Utilization 98th
99.3% (higher better, Efficiency)
Refuel Duration 81th
23d (lower better, Efficiency)
Startup Duration 86th
3.2d (lower better, Discipline)
Scrams (5-year) 70th
0.2/yr (lower better, Discipline)

Each dimension's percentile is computed across the active US fleet (93 units with sufficient history). Sub-score = average of its component percentiles. Composite = average of the three sub-scores. 5-year window. View full leaderboard →

Methodology

NukeWorker's Operational Excellence Score is a composite ranking that combines 7 publicly observable performance metrics into a single 0-100 number per US nuclear unit.

How it's computed: Each unit's raw value is converted to a percentile (0-100) within the 93 active US units that have at least 2 completed refueling cycles. The 7 percentiles are averaged into 3 sub-scores (Reliability, Efficiency, Discipline), and those are averaged into the final composite.

Active window — 5-year:

  • Reliability — Capacity factor (5yr), forced outage days/yr (5yr), B2B avg streak (lifetime)
  • Efficiency — in-cycle fuel utilization (3yr), median refuel duration (5yr)
  • Discipline — robust mean startup duration, scrams/yr (5yr, annualised)

Cohort rankings: alongside the fleet rank, each unit gets ranked within its reactor type (PWR/BWR), containment design (Ice Condenser, Mark I, etc.), and cycle length (12/18/24-month). Useful for apples-to-apples comparisons.

What's excluded: subjective community ratings, confidential INPO ratings, financial metrics. We only use publicly available NRC + cycle data.

Why three windows? 5yr (default) is the industry standard. 3yr captures recent operational changes and post-pandemic recovery. Lifetime gives newer units a fair comparison and reveals long-term consistency.

Edge cases: units with fewer than 2 cycles (e.g., Vogtle 4) show "Provisional". Decommissioned units excluded.

Refresh cadence: recomputed daily. Each window cached separately.

A data-derived proxy for operational performance; not affiliated with INPO. INPO ratings are confidential and qualitative — ours is public and quantitative.

5-yr trend: 2021: 57/100 (#41/93)2022: 43/100 (#59/92)2023: 80/100 (#12/92)2024: 51/100 (#44/93)2025: 73/100 (#18/93)2026: 74/100 (#19/93) Stable vs 2025
Compare LaSalle 2 head-to-head with up to 3 other units. Compare now

Capacity Factor (365-Day)

?
100%
Current
95%
365-Day Avg
#77
of 94 plants
Min: 0% Max: 100% 24 days <80%

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.
LaSalle 2 has completed 15 scheduled refueling outages on record, averaging 31 days each. The most recent, in Feb 2025, ran 20 days.

Power History (12-Month)

?
Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.
Over the past 12 months LaSalle 2 has run at an average of 95% of rated power. On the chart, green stretches are full-power running and dips toward zero mark reduced output or outages.

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Across its recorded history, LaSalle 2 has spent 460 days in scheduled refueling outages and 92 days in forced or unplanned outages. Taller bars mark the years with the most downtime.

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
LaSalle 2 has operated for about 41.7 years and averaged a 92.7% lifetime capacity factor, generating roughly 254.5 TWh of electricity. Its longest unbroken run reached 736 days.
Lifecycle & Tenure
Operating Age: 41.7 Yrs
Build Time: 11.1 Yrs
Lic. Remaining: 17.4 Yrs
Production & Power
Lifetime CF: 92.7%
Efficiency: 32%
Generated: 254.5 TWh
Reliability & Outages
Record Run: 736 Days
Refuelings: 15
Avg Startup: 7.7 Days

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
2601 North 21st Road
Marseilles, IL 61341, USA
Get Directions
Phone: (815) 357-6761

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2026.
$110
Lodging/Night
$68
M&IE/Day
$178
Total/Day
Standard Rate, IL

Unemployment Benefits IL

?
Maximum state unemployment insurance benefits for IL. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$859
Max Weekly
26
Max Weeks
$22,334
Max Total
7-day waiting period before benefits begin

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Constellation Energy
Architect Engineer: S&L
Constructor: CWE

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: BWR
Containment: BWR-MARK 2
NSS Supplier: GE 5
Thermal Power: 3546 MWt
Net Capacity: 1134 MWe
Efficiency: 32%
Status: Operating

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000374
License #: NPF-18
License Type: OL-FP
Const. Permit: 1973-09-10
Operating Lic: 1983-12-16
Commercial Op: 1984-10-19
License Renewed: 2016-10-19
License Exp: 2043-12-16

Market & Region

?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region: RFC — Reliability First Corporation
Census Region: ENC — East North Central
Balancing Authority: PJM — PJM Interconnection (ISO/RTO)
Market Structure: Merchant — Competitive generator selling into wholesale markets