Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
4 units: 4 under construction.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Akkuyu 1 PWR VVER V-509 1,114 2018-04-03 Under Construction
Akkuyu 2 PWR VVER V-509 1,114 2020-04-08 Under Construction
Akkuyu 3 PWR VVER V-509 1,114 2021-03-10 Under Construction
Akkuyu 4 PWR VVER V-509 1,114 2022-07-21 Under Construction
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Akkuyu 1 1,114 1,200 3,200 Atomenergomash ALSTOM
Akkuyu 2 1,114 1,200 3,200 Atomenergomash ALSTOM
Akkuyu 3 1,114 1,200 3,200 Atomenergomash ALSTOM
Akkuyu 4 1,114 1,200 3,200 Atomenergomash ALSTOM
Operator: Akkuyu Nuclear Joint Stock Company (JSC)
Owner: Akkuyu Nuclear Joint Stock Company (JSC)
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$235
Lodging/Night
$98
M&IE/Day
$333
Total/Day
Turkey: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Gülnar, Mersin, Turkey
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Akkuyu Nuclear Power Plant.

The Akkuyu nuclear power plant site is on the Mediterranean coast of Turkey at Büyükeceli, in Gülnar District, Mersin Province. The design comprises four VVER-1200 pressurized water reactor units.

Read more

Turkey and Russia signed an intergovernmental agreement in May 2010 for the construction of four units. Site work began in 2011, and a launch ceremony was held in April 2015. Construction of Unit 1 began on April 3, 2018, followed by Unit 2 in April 2020, Unit 3 on March 10, 2021, and Unit 4 on July 21, 2022. The first nuclear fuel was delivered on April 27, 2023.