2 units: 2 operational. Net capacity in service: 1,992 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Asco 1 PWR WH 3LP 995 1974-05-16 1983-08-13 1984-12-10 Operational
Asco 2 PWR WH 3LP 997 1975-03-07 1985-10-23 1986-03-31 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Asco 1 888 1,033 2,941 1983-06-16 WESTINGHOUSE ELECTRIC CORPORATION WESTINGHOUSE ELECTRIC CORPORATION
Asco 2 888 1,027 2,941 1985-09-11 WESTINGHOUSE ELECTRIC CORPORATION WESTINGHOUSE ELECTRIC CORPORATION
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Asco 1 299.9 TWh 85.1% 85.7% 88.1%
Asco 2 293.9 TWh 86.7% 87.4% 89.7%
Operator: ASOCIACIÓN NUCLEAR ASCÓ-VANDELLÓS A.I.E. (ENDESA/ID)
Owner: ENDESA, S.A.; ENDESA, IBERDROLA
Source: IAEA Power Reactor Information System (PRIS), as of 2026-11-02.

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
1 facility: 1 in operation.
Facility Type Scale Design Capacity Operated Status Operator
AFR DSF-ASCO AFR Dry Spent Fuel Storage Commercial 475 t HM 2013– In Operation
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$246
Lodging/Night
$146
M&IE/Day
$392
Total/Day
Spain: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Ascó, Catalonia, Spain
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Asc%C3%B3 Nuclear Power Plant; Foro Nuclear: The fifth Spanish nuclear power plant, Ascó I and II; Global Energy Monitor: Ascó nuclear power plant.

Ascó is a nuclear power plant at Ascó in Catalonia, Spain, with cooling water from the Ebro River.

Read more

Construction of Unit 1 began in May 1974 and Unit 2 in March 1975. Both units are Westinghouse-designed pressurized water reactors. Unit 1 was connected to the grid on 13 August 1983 and entered commercial operation in December 1984. Unit 2 was connected on 23 October 1985. In November 2007 a release of radioactive particles occurred at Unit 1, first rated INES level 1 and reclassified as level 2 in April 2008.