Barakah

Technical specifications, photos, nearby jobs, and satellite map for Barakah.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
4 units: 4 operational. Net capacity in service: 5,348 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Barakah 1 PWR APR-1400 1,337 2012-07-19 2020-08-19 2021-04-01 Operational
Barakah 2 PWR APR-1400 1,337 2013-04-15 2021-09-14 2022-03-24 Operational
Barakah 3 PWR APR-1400 1,337 2014-09-24 2022-10-08 2023-02-24 Operational
Barakah 4 PWR APR-1400 1,337 2015-07-30 2024-03-23 2024-09-07 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Barakah 1 1,310 1,417 3,983 2020-07-31 Korea Electric Power Corporation Korea Electric Power Corporation
Barakah 2 1,310 1,417 3,983 2021-08-27 Korea Electric Power Corporation Korea Electric Power Corporation
Barakah 3 1,310 1,417 3,983 2022-09-22 Korea Electric Power Corporation Korea Electric Power Corporation
Barakah 4 1,310 1,417 3,983 2024-03-01 Korea Electric Power Corporation Korea Electric Power Corporation
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Barakah 1 50.2 TWh 84.9% 84.5% 86.6%
Barakah 2 41.5 TWh 88.7% 88.3% 90.8%
Barakah 3 31.7 TWh 89.0% 88.3% 89.5%
Barakah 4 15.1 TWh 84.1% 83.3% 86.2%
Operator: Nawah Energy Company
Owner: Emirates Nuclear Energy Corporation
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$328
Lodging/Night
$149
M&IE/Day
$477
Total/Day
United Arab Emirates: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Barakah, Abu Dhabi Emirate, United Arab Emirates
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Barakah nuclear power plant.

Barakah Nuclear Power Plant is in the Al Dhafra region of the Emirate of Abu Dhabi, on the Persian Gulf coast, about 53 kilometers west-southwest of Al Dhannah City.

Read more

In December 2009 the Emirates Nuclear Energy Corporation awarded a contract to a consortium led by the Korea Electric Power Corporation. The plant has four APR-1400 pressurized water reactors. Construction began on July 19, 2012, for Unit 1, April 16, 2013, for Unit 2, September 24, 2014, for Unit 3 and July 30, 2015, for Unit 4. The units connected to the grid on August 19, 2020, September 14, 2021, October 8, 2022 and March 23, 2024.