Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
5 units: 2 operational, 3 permanent shutdown.
Net capacity in service: 932 MWe.
Operator: JADROVA A VYRADOVACIA SPOLOCNOST /NUCLEAR AND DECOMMISSIONING COMPANY, plc./; SLOVENSKÉ ELEKTRÁRNE, A.S.
Owner: JADROVA A VYRADOVACIA SPOLOCNOST /NUCLEAR AND DECOMMISSIONING COMPANY, plc./; SLOVENSKÉ ELEKTRÁRNE, A.S.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.
Fuel Cycle Facilities
?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
2 facilities: 1 in operation, 1 under construction.
Facility
Type
Scale
Design Capacity
Operated
Status
Operator
Bohunice NPP Site SFSF
AFR Wet Spent Fuel Storage (Pool)
Commercial
14112 Elements/year
1987–
In Operation
JAVYS
Bohumice NPP Site SFSF
AR Spent Fuel Storage
Commercial
10115 Elements/year
2023–
Under Construction
JAVYS
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.
Working Here
Per Diem Rates
FY 2026
?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$144
Lodging/Night
$89
M&IE/Day
$233
Total/Day
Slovakia: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
48.4942, 17.6791
Location & Contact
?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Bohunice Nuclear Power Plant; IAEA PRIS: Slovakia.
The Bohunice nuclear power plant is at Jaslovské Bohunice in the Trnava region of western Slovakia. The site had an early unit, A1, and four VVER-440 pressurized water reactors in two pairs, V1 and V2.
Read more
A1 was connected to the grid on December 25, 1972. A coolant leak during refuelling in 1976 killed two workers, and an accident in February 1977 was rated level 4 on the International Nuclear Event Scale. A1 was shut down on February 22, 1977. The V1 units were connected on December 17, 1978, and March 26, 1980, and closed on December 31, 2006, and December 31, 2008, as required for Slovakia's 2004 accession to the European Union. The V2 units were connected on August 20, 1984, and August 9, 1985.