Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
GENERAL NUCLEAR ENGINEERING & PUERTO RICO WATER RESOURCES AUTHORITY (US)
GENERAL ELECTRIC CO.
Operator: DOE & PUERTO RICO WATER RESOURCES
Owner: US DOE and Puerto Rico Electric Power Authority
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.
Working Here
Per Diem Data
?
GSA per diem rates for the area near this facility. Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel. Links open the official GSA rate lookup.
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
18.3652, -67.2688
Location & Contact
?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: DOE Legacy Management: BONUS, Puerto Rico, Decommissioned Reactor Site Fact Sheet; EECAP: Puerto Rico Nuclear Center Information; ANS: Nuclear Energy for Puerto Rico.
BONUS (Boiling Nuclear Superheater) was a prototype nuclear power plant at Punta Higuera, on the northwest side of Rincon, Puerto Rico. It was a joint project of the U.S. Atomic Energy Commission and the Puerto Rico Water Resources Authority, built to test a boiling reactor that superheated its own steam.
Read more
Construction started in 1960. The reactor reached its first controlled chain reaction on April 13, 1964, was first connected to the grid on August 14, 1964, and reached full power in 1965. It was permanently shut down on June 1, 1968, because of technical difficulties and the costly modifications they would have required. During 1969 and 1970 the fuel and highly activated parts were shipped to the mainland, and the reactor vessel was entombed in concrete inside the dome-shaped building.
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.