BONUS

Permanently Shut Down

DOE/PRW·Punta Higuera, PR·BWR·17 MWe

Technical specifications, photos, nearby jobs, satellite map, contact information, and per diem rates for BONUS.

Permanently Shut Down

Permanently shut down on 1968-06-01.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
1 unit: 1 permanent shutdown.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
BONUS BWR Superheater 17 1960-01-01 1964-08-14 1965-09-01 1968-06-01 Permanent Shutdown
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
BONUS 17 18 50 1964-04-13 GENERAL NUCLEAR ENGINEERING & PUERTO RICO WATER RESOURCES AUTHORITY (US) GENERAL ELECTRIC CO.
Operator: DOE & PUERTO RICO WATER RESOURCES
Owner: US DOE and Puerto Rico Electric Power Authority
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Data

?
GSA per diem rates for the area near this facility. Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel. Links open the official GSA rate lookup.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Punta Higuera, PR 00677, USA
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: DOE Legacy Management: BONUS, Puerto Rico, Decommissioned Reactor Site Fact Sheet; EECAP: Puerto Rico Nuclear Center Information; ANS: Nuclear Energy for Puerto Rico.

BONUS (Boiling Nuclear Superheater) was a prototype nuclear power plant at Punta Higuera, on the northwest side of Rincon, Puerto Rico. It was a joint project of the U.S. Atomic Energy Commission and the Puerto Rico Water Resources Authority, built to test a boiling reactor that superheated its own steam.

Read more

Construction started in 1960. The reactor reached its first controlled chain reaction on April 13, 1964, was first connected to the grid on August 14, 1964, and reached full power in 1965. It was permanently shut down on June 1, 1968, because of technical difficulties and the costly modifications they would have required. During 1969 and 1970 the fuel and highly activated parts were shipped to the mainland, and the reactor vessel was entombed in concrete inside the dome-shaped building.

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: DOE/PRW
Publicly Traded No — Federal government facility

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: BWR
NSS Supplier: GNEPRWR
Net Capacity: 17 MWe
Status: ENTOMB

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Const. Permit: 1960-01-01
Operating Lic: 1964-08-14