Chalk River
Chalk River, ON
Reactor Data
Research Reactors
| Reactor | Type | Thermal Power | First Criticality | Shutdown | Status | Used For |
|---|---|---|---|---|---|---|
| ZED-2 | Tank | 200 Wt | 1960-09-07 | Operational | materials testing | |
| ZEEP | Heavy Water | 1 Wt | 1945-09-01 | Decommissioned | ||
| NRX | Heavy Water | 42 MWt | 1947-07-22 | 1993-03-30 | Permanent shutdown | |
| PTR | Pool | 100 Wt | 1957-11-01 | Decommissioned | ||
| NRU | Heavy Water | 135 MWt | 1957-11-03 | 2018-03-31 | Permanent shutdown | isotope production, neutron scattering, materials testing, training |
| MAPLE 2 | Tank In Pool | 10 MWt | 2008-05-19 | Permanent shutdown | ||
| MAPLE 1 | Tank In Pool | 10 MWt | 2008-05-19 | Permanent shutdown |
Fuel Cycle Facilities
| Facility | Type | Scale | Design Capacity | Operated | Status | Operator |
|---|---|---|---|---|---|---|
| Waste Management Area B / Fuel Package and Storage, FPS | Waste Management Facilities | Commercial | 1953– | In Operation | AECL Chalk River National Lab | |
| Waste Management Area C | Waste Management Facilities | Commercial | 129000 m3 | 1963– | In Operation | AECL Chalk River National Lab |
| Waste Management Area D | Waste Management Facilities | Commercial | 35000 m3 | 1974– | In Operation | AECL Chalk River National Lab |
| NPD Spent Fuel Storage | AFR Dry Spent Fuel Storage | Commercial | 75 t HM | 1987– | In Operation | AECL Chalk River National Lab |
| Waste Management Area G | AFR Dry Spent Fuel Storage | Commercial | 1988– | In Operation | AECL Chalk River National Lab | |
| Waste Management Area H | Waste Management Facilities | Commercial | 53100 m3 | 2002– | In Operation | AECL Chalk River National Lab |
| Waste Management Area J | Waste Management Facilities | Commercial | 28500 m3 | 2010– | In Operation | AECL Chalk River National Lab |
| Waste Management Area A | Waste Management Facilities | Commercial | 1946–1955 | Shutdown | AECL Chalk River National Lab | |
| Pu and Thorium Processing Facility | MOX fuel fabrication (Mox Powder, Pellet, Pin, FA) | Laboratory | 0 t HM/year | 1952–1957 | Decommissioning | AECL Research Company |
| Waste Management Area E | Waste Management Facilities | Commercial | 22000 m3 | 1976–1984 | Shutdown | AECL Chalk River National Lab |
| Waste Management Area F | Waste Management Facilities | Commercial | 1976–1980 | Shutdown | AECL Chalk River National Lab | |
| Recycle Fuel Fabr. Lab. (RFFL) | MOX fuel fabrication (Mox Powder, Pellet, Pin, FA) | Laboratory | 0 t HM/year | 1979–2018 | Stand By | Atomic Energy of Canada Ltd (AECL) |
| Chalk River Laboratories, NFFF | Fuel Fabrication (Research Reactors) | Commercial | 1990–2018 | Stand By | Atomic Energy of Canada Ltd (AECL) |
Working Here
Per Diem Rates FY 2026
Facility Map
46.053, -77.364
Location & Contact
Plant Facts
About This Site
Chalk River Laboratories is a nuclear research site on the Ottawa River in Renfrew County, Ontario, near Deep River and about 180 kilometers northwest of Ottawa. It was established in 1944 and later housed research reactors together with fuel and waste facilities.
Read more
ZEEP, a zero-energy experimental reactor, reached criticality on September 5, 1945, and NRX started in 1947. A power excursion at NRX on December 12, 1952 caused major core damage, and the reactor returned to use 14 months later. Atomic Energy of Canada Limited was created in 1952 and took over the site. NRU began operation in 1957, and a fuel rupture and fire occurred there in 1958. NRX closed in 1993 and NRU was shut down permanently on March 31, 2018. The MAPLE reactors were cancelled in 2008.