Dimitrovgrad
Reactor Data
Research Reactors
| Reactor | Type | Thermal Power | First Criticality | Shutdown | Status | Used For |
|---|---|---|---|---|---|---|
| SM-3 | Pressure Vessel | 1 MWt | 1961-01-10 | Operational | isotope production, materials testing, transmutation, activation analysis, training | |
| VK-50 | Bwr-prototype | 2 MWt | 1964-12-15 | Operational | materials testing, activation analysis, training | |
| FM MIR.M1 | Crit Assembly | 5 Wt | 1966-10-30 | Operational | teaching, training | |
| MIR.M1 | Pool/channels | 1 MWt | 1966-12-24 | Operational | isotope production, materials testing, activation analysis, training | |
| BOR-60 | Fast Breeder | 60 MWt | 1968-12-30 | Operational | isotope production, materials testing, training | |
| FM SM-3 | Crit Assembly | 20 Wt | 1970-01-01 | Operational | teaching, training | |
| RBT-6 | Pool | 6 MWt | 1975-09-24 | Operational | isotope production, materials testing, transmutation, activation analysis | |
| RBT-10/2 | Pool | 7 MWt | 1983-11-24 | Operational | isotope production, materials testing, transmutation, neutron capture therapy, training | |
| Arbus (AST-1) | Tank | 12 MWt | 1963-01-01 | 1988-05-01 | Decommissioned | |
| RBT-10/1 | Pool | 10 MWt | 1983-12-01 | Decommissioned | ||
| MBIR | Fast, Power | 15 MWt | Under construction | isotope production, materials testing, transmutation |
Fuel Cycle Facilities
| Facility | Type | Scale | Design Capacity | Operated | Status | Operator |
|---|---|---|---|---|---|---|
| RIAR (Research Institute of Atomic Reactors) | Spent Fuel Reprocessing - aqueous route | Pilot plant | 1 t HM/year | 1965– | In Operation | V I Lenin Research Institute of Nuclear Reactors (Niiar) |
| RIAR (Research Institute of Atomic Reactors) | MOX fuel fabrication (Mox Powder, Pellet, Pin, FA) | Pilot plant | 1 t HM/year | 1975– | In Operation | MINING AND CHEMICAL COMPLEX |
Working Here
Per Diem Rates FY 2026
Facility Map
54.1861, 49.4761
Location & Contact
Plant Facts
About This Site
The Research Institute of Atomic Reactors (RIAR) is a nuclear research center in Dimitrovgrad, Ulyanovsk Oblast, Russia. The institute was founded in 1956, although some sources give 1954 or 1958, and its reactors have included the SM, MIR, BOR-60 and VK-50.
Read more
The SM reactor was commissioned in October 1961 and reached its design power of 50 megawatts that autumn. A core enlargement in 1965 raised its power to 75 megawatts. The VK-50 boiling water reactor had its physical startup in December 1964 and its power startup in October 1965. The MIR channel-type reactor began operation in December 1966. Construction of the BOR-60 sodium-cooled fast reactor began in 1964, and it reached first criticality in 1968 and was commissioned in 1969.