Fernald (FEMP)

Hamilton, OH

Community ratings, technical specifications, photos, nearby jobs, satellite map, and per diem rates for Fernald (FEMP).

Facility Data

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
1 facility: 1 decommissioned.
Facility Type Scale Design Capacity Operated Status Operator
Plant 7 (Hex Reduction Plant) Conversion to UF4 Commercial 0 t HM/year 1954–1956 Decommissioned
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2027

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
$131
Lodging/Night
$74
M&IE/Day
$205
Total/Day
Hamilton, Butler / Warren County, OH

Unemployment Benefits OH

?
Maximum state unemployment insurance benefits for OH. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$789
Max Weekly
26
Max Weeks
$20,514
Max Total
7-day waiting period before benefits begin

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
7400 Willey Road
Hamilton, OH 45013, USA
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Fernald Feed Materials Production Center.

The Fernald Feed Materials Production Center was a uranium metal production plant in Crosby Township, Hamilton County, and Ross Township, Butler County, Ohio, about 20 miles northwest of Cincinnati. It covered about 1,050 acres and refined uranium for the U.S. nuclear weapons complex.

Read more

Construction began in May 1951, the pilot plant started operating in October 1951, and National Lead Company of Ohio won the contract to operate the plant. Plant 9 began operating in October 1954. Westinghouse took over operations on January 1, 1986. The plant stopped production in 1989 and was listed as a Superfund site on November 21, 1989. Fluor Fernald was awarded the cleanup contract in 1992 and completed its work on October 29, 2006. The site was renamed the Fernald Preserve in 2007.