Fukushima Daini

Technical specifications, photos, nearby jobs, and satellite map for Fukushima Daini.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
4 units: 4 permanent shutdown.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Fukushima-Daini 1 BWR BWR-5 1,067 1976-03-16 1981-07-31 1982-04-20 2019-09-30 Permanent Shutdown
Fukushima-Daini 2 BWR BWR-5 1,067 1979-05-25 1983-06-23 1984-02-03 2019-09-30 Permanent Shutdown
Fukushima-Daini 3 BWR BWR-5 1,067 1981-03-23 1984-12-14 1985-06-21 2019-09-30 Permanent Shutdown
Fukushima-Daini 4 BWR BWR-5 1,067 1981-05-28 1986-12-17 1987-08-25 2019-09-30 Permanent Shutdown
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Fukushima-Daini 1 1,067 1,100 3,293 1981-06-17 TOSHIBA CORPORATION TOSHIBA CORPORATION
Fukushima-Daini 2 1,067 1,100 3,293 1983-04-26 HITACHI, LTD. HITACHI, LTD.
Fukushima-Daini 3 1,067 1,100 3,293 1984-10-18 TOSHIBA CORPORATION TOSHIBA CORPORATION
Fukushima-Daini 4 1,067 1,100 3,293 1986-10-24 HITACHI, LTD. HITACHI, LTD.
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Fukushima-Daini 1 205.7 TWh 58.3% 58.8% 59.4%
Fukushima-Daini 2 190.6 TWh 56.5% 56.8% 57.2%
Fukushima-Daini 3 163.1 TWh 50.3% 50.9% 51.2%
Fukushima-Daini 4 161.4 TWh 52.9% 53.4% 53.8%
Operator: Tokyo Electric Power Company Holdings, Inc.
Owner: Tokyo Electric Power Company Holdings, Inc.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-14.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$208
Lodging/Night
$107
M&IE/Day
$315
Total/Day
Japan: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Tomioka, Fukushima Prefecture, Japan
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Fukushima Daini Nuclear Power Plant.

Fukushima Daini Nuclear Power Plant is in the towns of Naraha and Tomioka, Fukushima Prefecture, Japan.

Read more

Construction began on 16 March 1976. It has four boiling water reactors of the BWR-5 type, with Toshiba supplying Units 1 and 3 and Hitachi supplying Units 2 and 4. The units were connected to the grid between 1981 and 1986. During the 11 March 2011 earthquake and tsunami all four units shut down automatically and were in cold shutdown by 15 March. The operator decided to decommission the plant on 31 July 2019, and the units were permanently shut down that September.