Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
2 facilities: 2 in operation.
Facility
Type
Scale
Design Capacity
Operated
Status
Operator
Wilmington
Zirconium Alloy Tubing
Commercial
2200 km/year
1981–
In Operation
GENERAL ELECTRIC Co
Wilmington Facility
Fuel Fabrication (U Pellet, Pin, FA)
Commercial
1200 t HM/year
1982–
In Operation
GE Nuclear Energy
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.
Active nuclear industry job listings in NC from the NukeWorker job board. Click a job title for full details, or click the header to search all jobs in this state.
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
Maximum state unemployment insurance benefits for NC. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
34.323, -77.934
Location & Contact
?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wilmington Business Journal: GE Hitachi Nuclear Energy; GE Vernova: Wilmington fact sheet; NRC: GNF-A Wilmington license correspondence (SNM-1097).
The Wilmington fuel fabrication plant of Global Nuclear Fuel (GNF), a nuclear fuel venture involving General Electric, stands on Castle Hayne Road (N.C. Highway 133) about six miles north of the city of Wilmington, in New Hanover County, North Carolina. The site covers roughly 1,600 acres and was built to manufacture fuel for boiling water reactors.
Read more
General Electric selected Wilmington in the 1960s after reviewing more than 100 communities. Ground was broken in 1967 and operations began in 1969, although a company fact sheet dates the site to 1968. The Global Nuclear Fuel joint venture was formed in 2001, and GE moved its nuclear headquarters from San Jose, California, to Wilmington in 2003.