Grand Gulf 1

Online · 100% power

Entergy·Port Gibson, MS·BWR·1,401 MWe

Live reactor status, daily power data, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Grand Gulf 1.

?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
   
Excellence
Rank locked · 93 units
Subscribers
?
Current reactor power level from the most recent NRC daily report.
100%
Power
ONLINE
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
199
Current Run
days
#39 of 95
Mid Quartile
?
Longest recorded period of continuous operation between outages.
742
Record Run
days
#7 of 95
Top Quartile
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (612 days for this 24-month cycle unit) with no trips to 0% power.
1
B2B Runs
#82 of 84
Bottom Quartile
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
83.6%
Capacity Factor
#89 of 95
Bottom Quartile
?
Net electricity actually generated over the most recent 12 months reported by the U.S. Energy Information Administration (Form EIA-923). These are authoritative actuals, not an estimate.
10.16 TWh
Net Generation
EIA-923 · 12 mo to 2026-07
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
29
Scrams
#94 of 94
Bottom Quartile
?
Years since commercial operation began. License remaining: 18.1 years.
41.3
Operating Age
years
18.1 yrs remaining

Excellence Score, Records & Plant Facts

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Grand Gulf 1 has operated for about 41.3 years and averaged a 83.6% lifetime capacity factor, generating roughly 269.6 TWh of electricity. Its longest unbroken run reached 742 days.
Lifecycle & Tenure
Operating Age: 41.3 Yrs
Build Time: 10.8 Yrs
Lic. Remaining: 18.1 Yrs
Production & Power
Lifetime CF: 83.6%
Efficiency: 31.8%
Generated: 269.6 TWh
Reliability & Outages
Record Run: 742 Days
Refuelings: 16
Avg Startup: 12.6 Days

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Entergy
Architect Engineer: BECH
Constructor: BECH
Ownership, operation and management history
No change of owner, operator or management company on record. Our history starts in 1999.
ETR Entergy Corporation NYSE
$102.80 ▲ +0.31 (+0.30%)
Previous Close 102.49
Day's Range 102.25 – 102.95
52-Week Range 90.87 – 118.45
Volume 2,161,256
Delayed quote as of Oct 9, 2026 4:00 PM ET. Source: Yahoo Finance. Full quote on Yahoo Finance

Operational Excellence Score Subscribers

Grand Gulf 1 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.

  • This unit's composite score and fleet rank
  • Reliability, Efficiency and Discipline sub-scores
  • All seven measured inputs, with fleet percentiles
  • Rank against comparable units, not just the fleet
  • Three-year, five-year and lifetime windows
  • Five-year trend, and every other operating US reactor

Included with every outage subscription and with NukeWorker Gold membership. Trading the outage rather than working it? The same record, cut by power market, is on NukeGryd.

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: BWR
Containment: BWR-MARK 3
NSS Supplier: GE 6
Thermal Power: 4408 MWt
Net Capacity: 1401 MWe
Efficiency: 31.8%
Status: Operating

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000416
License #: NPF-29
License Type: OL-FP
Const. Permit: 1974-09-04
Operating Lic: 1984-11-01
Commercial Op: 1985-07-01
License Renewed: 2016-12-01
License Exp: 2044-11-01

Market & Region

?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region: SERC — SERC Reliability Corporation
Census Region: ESC — East South Central
Balancing Authority: MISO — Midcontinent Independent System Operator (ISO/RTO)
Market Structure: Regulated — Rate-regulated utility (cost-of-service pricing)