Gundremmingen

Technical specifications, photos, nearby jobs, and satellite map for Gundremmingen.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
3 units: 3 permanent shutdown.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Gundremmingen-A BWR BWR-1 237 1962-12-12 1966-12-01 1967-04-12 1977-01-13 Permanent Shutdown
Gundremmingen-B BWR BWR-72 1,284 1976-07-20 1984-03-16 1984-07-19 2017-12-31 Permanent Shutdown
Gundremmingen-C BWR BWR-72 1,288 1976-07-20 1984-11-02 1985-01-18 2021-12-31 Permanent Shutdown
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Gundremmingen-A 237 250 801 1966-08-14 ALLGEMEINE ELECTRICITAETS-GESELLSCHAFT, GENERAL ELECTRIC COMPANY (US) ALLGEMEINE ELEKTRICITAETS-GESELLSCHAFT Decommissioning from 1983-05-26
Gundremmingen-B 1,244 1,344 3,840 1984-03-09 KRAFTWERK UNION, AG KRAFTWERK UNION, AG Decommissioning from 2019-03-19
Gundremmingen-C 1,249 1,344 3,840 1984-10-26 KRAFTWERK UNION, AG KRAFTWERK UNION, AG Decommissioning from 2022-04-13
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Gundremmingen-A 13.8 TWh 80.1% 79.6% 80.6%
Gundremmingen-B 314.5 TWh 84.0% 88.1% 90.4%
Gundremmingen-C 344.7 TWh 82.9% 87.2% 89.3%
Operator: RWE Nuclear GmbH
Owner: RWE Nuclear GmbH
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-26.

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
1 facility: 1 in operation.
Facility Type Scale Design Capacity Operated Status Operator
Gundremmingen NPP On-site Storage Facility AFR Dry Spent Fuel Storage Commercial 1850 t HM 2006–2046 In Operation BundesGesel,Germany
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$237
Lodging/Night
$140
M&IE/Day
$377
Total/Day
Germany: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Gundremmingen, Bavaria, Germany
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Gundremmingen Nuclear Power Plant.

Gundremmingen is a nuclear power plant at Gundremmingen in the Günzburg district of Bavaria, Germany, on the Danube River.

Read more

All three units were boiling water reactors. Construction of Unit A began on 12 December 1962, and it was connected to the grid on 1 December 1966. On 13 January 1977 a serious accident destroyed Unit A beyond repair, and it was never restarted. Construction of Units B and C began in July 1976. Unit B was connected to the grid on 16 March 1984 and Unit C on 2 November 1984. Unit B was permanently shut down on 31 December 2017 and Unit C on 31 December 2021.