Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
5 units: 3 suspended operation, 2 permanent shutdown. Net capacity in service: 3,473 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Hamaoka 1 BWR BWR-4 515 1971-06-10 1974-08-13 1976-03-17 2009-01-30 Permanent Shutdown
Hamaoka 2 BWR BWR-4 806 1974-06-14 1978-05-04 1978-11-29 2009-01-30 Permanent Shutdown
Hamaoka 3 BWR BWR-5 1,056 1983-04-18 1987-01-20 1987-08-28 Suspended Operation
Hamaoka 4 BWR BWR-5 1,092 1989-10-13 1993-01-27 1993-09-03 Suspended Operation
Hamaoka 5 BWR ABWR 1,325 2000-07-12 2004-04-30 2005-01-18 Suspended Operation
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Hamaoka 1 516 540 1,593 1974-06-20 TOSHIBA CORPORATION HITACHI, LTD. Decommissioning from 2009-11-18
Hamaoka 2 814 840 2,436 1978-03-28 TOSHIBA CORPORATION HITACHI, LTD. Decommissioning from 2009-11-18
Hamaoka 3 1,056 1,100 3,293 1986-11-21 TOSHIBA CORPORATION HITACHI, LTD. Suspended 2010-11-29
Hamaoka 4 1,092 1,137 3,293 1992-12-02 TOSHIBA CORPORATION HITACHI, LTD. Suspended 2011-05-13
Hamaoka 5 1,325 1,380 3,926 2004-03-23 TOSHIBA CORPORATION HITACHI, LTD. Suspended 2011-05-14
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Hamaoka 1 73.6 TWh 47.9% 48.2% 50.1%
Hamaoka 2 129.6 TWh 59.6% 59.5% 60.8%
Hamaoka 3 171.1 TWh 78.0% 78.5% 79.0%
Hamaoka 4 130.4 TWh 79.5% 79.5% 80.0%
Hamaoka 5 39.0 TWh 49.0% 47.8% 47.6%
Operator: CHUBU ELECTRIC POWER CO., INC.
Owner: CHUBU ELECTRIC POWER CO., INC.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$208
Lodging/Night
$107
M&IE/Day
$315
Total/Day
Japan: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Omaezaki, Shizuoka Prefecture, Japan
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Hamaoka Nuclear Power Plant.

Hamaoka Nuclear Power Plant is at Omaezaki, Shizuoka Prefecture, Japan, on the Pacific coast about 200 km southwest of Tokyo, in an area above a subduction zone.

Read more

Construction of Unit 1 began on 10 June 1971 and the five boiling water reactors were built over three decades, with Units 1 to 4 supplied by General Electric designs and Unit 5 an advanced design. Unit 1 entered commercial operation in 1976 and Unit 5 in January 2005. Units 1 and 2 were permanently shut down on 30 January 2009. In May 2011, after the Fukushima accident, the prime minister asked for the plant to be halted, and Units 4 and 5 were shut down on 13 and 14 May.