| Unit | Type | Model | Net MWe | Construction | Grid | Commercial Op | Shutdown | Status |
|---|---|---|---|---|---|---|---|---|
| Hinkley Point A-1 | GCR | MAGNOX | 235 | 1957-11-01 | 1965-02-16 | 1965-03-30 | 2000-05-23 | Permanent Shutdown |
| Hinkley Point A-2 | GCR | MAGNOX | 235 | 1957-11-01 | 1965-03-19 | 1965-05-05 | 2000-05-23 | Permanent Shutdown |
| Hinkley Point B-2 | GCR | AGR | 480 | 1967-09-01 | 1976-02-05 | 1976-09-27 | 2022-07-06 | Permanent Shutdown |
| Hinkley Point B-1 | GCR | AGR | 485 | 1967-09-01 | 1976-10-30 | 1978-10-02 | 2022-08-01 | Permanent Shutdown |
| Hinkley Point C-1 | PWR | EPR-1750 | 1,630 | 2018-12-11 | Under Construction | |||
| Hinkley Point C-2 | PWR | EPR-1750 | 1,630 | 2019-12-12 | Under Construction |
| Unit | Design MWe | Gross MWe | Thermal MWt | First Criticality | Reactor Supplier | Turbine Supplier | Notes |
|---|---|---|---|---|---|---|---|
| Hinkley Point A-1 | 250 | 267 | 900 | 1964-05-01 | THE ENGLISH ELECTRIC CO., LTD / BABCOCK & WILCOX CO. / TAYLOR WOODROW CONSTRUCTION, LTD. | THE ENGLISH ELECTRIC CO., LTD. | |
| Hinkley Point A-2 | 250 | 267 | 900 | 1964-10-01 | THE ENGLISH ELECTRIC CO., LTD / BABCOCK & WILCOX CO. / TAYLOR WOODROW CONSTRUCTION, LTD. | THE ENGLISH ELECTRIC CO., LTD. | |
| Hinkley Point B-2 | 625 | 655 | 1,494 | 1976-02-01 | THE NUCLEAR POWER GROUP, LTD. | GENERAL ELECTRIC COMPANY (UK) | |
| Hinkley Point B-1 | 625 | 655 | 1,494 | 1976-09-24 | THE NUCLEAR POWER GROUP, LTD. | GENERAL ELECTRIC COMPANY (UK) | |
| Hinkley Point C-1 | 1,630 | 1,720 | 4,524 | FRAMATOME | Alstom - General Electric (France) 48, rue Albert Dhalenne 93400 Saint-Ouen, FRANCE | ||
| Hinkley Point C-2 | 1,630 | 1,720 | 4,524 | FRAMATOME | Alstom - General Electric (France) 48, rue Albert Dhalenne 93400 Saint-Ouen, FRANCE |
| Unit | Electricity Supplied | Load Factor | Energy Availability | Operating Factor |
|---|---|---|---|---|
| Hinkley Point A-1 | 46.5 TWh | 72.4% | 74.5% | 89.0% |
| Hinkley Point A-2 | 46.5 TWh | 72.4% | 74.5% | 89.0% |
| Hinkley Point B-2 | 148.0 TWh | 73.4% | 74.1% | 78.1% |
| Hinkley Point B-1 | 151.9 TWh | 76.5% | 75.6% | 80.1% |
Working Here
Per Diem Rates FY 2026
Photos
Facility Map
51.209, -3.127
Location & Contact
Plant Facts
About This Site
Hinkley Point is a nuclear power station site on the Bristol Channel coast of Somerset, England, near Bridgwater. It has three station areas, A, B and C.
Read more
Hinkley Point A had two Magnox reactors. Construction began on 1 November 1957, the units were connected to the grid in February and March 1965, and the station was formally opened on 22 April 1966. Permanent closure was announced in May 2000. Hinkley Point B has two advanced gas-cooled reactors, begun on 1 September 1967 and connected to the grid in 1976. They were permanently shut down in July and August 2022. Hinkley Point C received a nuclear site license for two EPR units in November 2012, and its first nuclear concrete was poured on 11 December 2018.