Juragua
Cienfuegos
Working Here
Per Diem Rates FY 2026
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$100
Lodging/Night
$49
M&IE/Day
$149
Total/Day
Cuba: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.
Photos
Photos of this facility from the NukeWorker photo gallery. Click the header or any photo to browse the full album.
Facility Map
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
22.0663, -80.5133
Location & Contact
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Plant Facts
About This Site
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Juragua Nuclear Power Plant; NBC News: Cuba's unfinished power source.
Juragua was to be Cuba's first nuclear power plant, built with Soviet help on the coast near Cienfuegos. A 1976 agreement with the Soviet Union called for two VVER-440 pressurized water reactors of 440 MWe each. Work on the first unit began in 1983 and on the second in 1985.
Read more
Construction was suspended in 1992, after the collapse of the Soviet Union ended its economic aid to Cuba. Neither reactor was finished or loaded with fuel, and the plant never produced electricity.
Never completed: construction stopped in 1992
