Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
Maximum state unemployment insurance benefits for CT. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
41.311, -72.1668
Location & Contact
?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Millstone Nuclear Power Station.
Millstone Nuclear Power Station is at Waterford, in New London County, Connecticut, on Long Island Sound, on the site of a former quarry. It was built with three units.
Read more
Construction began on Unit 1 (General Electric boiling water reactor) in May 1966, Unit 2 (Combustion Engineering pressurized water reactor) in November 1969, and Unit 3 (Westinghouse pressurized water reactor) in August 1974. They connected to the grid in 1970, 1975 and 1986. A leaking valve in February 1996 led to the shutdown of all the reactors for repairs. Unit 3 restarted in July 1998 and Unit 2 in May 1999. Unit 1 was permanently shut down in July 1998, because the cost of fixing its safety issues was too high.
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Dominion Energy and NextEra Energy (NEE) announced a merger on 2026-05-18. It is still subject to regulatory and shareholder approval, so Dominion remains the owner of record here until the deal closes.
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.