Mochovce
Reactor Data
Reactor Units
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
4 units: 3 operational, 1 under construction.
Net capacity in service: 1,374 MWe.
| Unit | Type | Model | Net MWe | Construction | Grid | Commercial Op | Shutdown | Status |
|---|---|---|---|---|---|---|---|---|
| Mochovce 4 | PWR | VVER V-213 | 440 | 1987-01-27 | Under Construction | |||
| Mochovce 1 | PWR | VVER V-213 | 467 | 1983-10-13 | 1998-07-04 | 1998-10-29 | Operational | |
| Mochovce 2 | PWR | VVER V-213 | 469 | 1983-10-13 | 1999-12-20 | 2000-04-11 | Operational | |
| Mochovce 3 | PWR | VVER V-213 | 438 | 1987-01-27 | 2023-01-31 | 2024-11-06 | Operational |
Capacity, milestones and suppliers
| Unit | Design MWe | Gross MWe | Thermal MWt | First Criticality | Reactor Supplier | Turbine Supplier | Notes |
|---|---|---|---|---|---|---|---|
| Mochovce 4 | 440 | 471 | 1,375 | 2026-08-06 | ŠKODA CONCERN NUCLEAR POWER PLANT WORKS | ŠKODA CONCERN NUCLEAR POWER PLANT WORKS | First criticality 2026-08-06 per Slovenske elektrarne; grid connection not yet reported |
| Mochovce 1 | 408 | 500 | 1,471 | 1998-06-09 | ŠKODA CONCERN NUCLEAR POWER PLANT WORKS | ŠKODA CONCERN NUCLEAR POWER PLANT WORKS | |
| Mochovce 2 | 408 | 500 | 1,471 | 1999-12-01 | ŠKODA CONCERN NUCLEAR POWER PLANT WORKS | ŠKODA CONCERN NUCLEAR POWER PLANT WORKS | |
| Mochovce 3 | 440 | 470 | 1,375 | 2022-10-22 | ŠKODA CONCERN NUCLEAR POWER PLANT WORKS | ŠKODA CONCERN NUCLEAR POWER PLANT WORKS |
Lifetime performance, through 2025
| Unit | Electricity Supplied | Load Factor | Energy Availability | Operating Factor |
|---|---|---|---|---|
| Mochovce 1 | 89.1 TWh | 86.7% | 87.3% | 89.8% |
| Mochovce 2 | 85.0 TWh | 86.7% | 88.2% | 90.2% |
| Mochovce 3 | 8.1 TWh | 88.6% | 87.6% | 88.1% |
Operator: SLOVENSKÉ ELEKTRÁRNE, A.S.
Owner: SLOVENSKÉ ELEKTRÁRNE, A.S.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-11-02.
Working Here
Per Diem Rates FY 2026
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$144
Lodging/Night
$89
M&IE/Day
$233
Total/Day
Slovakia: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.
Photos
Photos of this facility from the NukeWorker photo gallery. Click the header or any photo to browse the full album.
Facility Map
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
48.2625, 18.4548
Location & Contact
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Plant Facts
About This Site
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Mochovce Nuclear Power Plant; IAEA PRIS: Slovakia.
The Mochovce nuclear power plant is in the Nitra Region of Slovakia, between the towns of Nitra and Levice. Its reactors are VVER-440/213 pressurized water reactors.
Read more
Construction of Units 1 and 2 began in October 1983. Unit 1 entered commercial operation on October 29, 1998, and Unit 2 was connected to the grid on December 20, 1999. Construction of Units 3 and 4 started in the 1980s, was halted in 1991, and resumed in November 2008. Unit 3 reached first criticality on October 22, 2022, and was connected to the grid on January 31, 2023.
