Ningde

Technical specifications, photos, nearby jobs, and satellite map for Ningde.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
6 units: 4 operational, 2 under construction. Net capacity in service: 4,072 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Ningde 1 PWR CPR-1000 1,018 2008-02-18 2012-12-28 2013-04-15 Operational
Ningde 2 PWR CPR-1000 1,018 2008-11-12 2014-01-04 2014-05-04 Operational
Ningde 3 PWR CPR-1000 1,018 2010-01-08 2015-03-21 2015-06-10 Operational
Ningde 4 PWR CPR-1000 1,018 2010-09-29 2016-03-29 2016-07-21 Operational
Ningde 5 PWR HPR1000 1,200 2024-07-28 Under Construction
Ningde 6 PWR HPR1000 1,117 2025-12-16 Under Construction
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Ningde 1 1,018 1,089 2,905 2012-11-24 Dongfang Electric Corporation Dongfang Electric Corporation
Ningde 2 1,018 1,089 2,905 2013-12-20 Shanghai Electric Dongfang Electric Corporation
Ningde 3 1,018 1,089 2,905 2015-03-08 China First Heavy Industries Dongfang Electric Corporation
Ningde 4 1,018 1,089 2,905 2016-03-16 China First Heavy Industries Dongfang Electric Corporation
Ningde 5 1,200 1,200 3,180 China First Heavy Industries Dongfang Turbine Co., Ltd
Ningde 6 1,117 1,221 3,190 Dongfang Electric Corporation Dongfang Turbine Co., Ltd
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Ningde 1 100.2 TWh 87.6% 89.9% 88.9%
Ningde 2 93.1 TWh 88.7% 91.9% 90.8%
Ningde 3 84.9 TWh 90.3% 92.7% 92.0%
Ningde 4 76.2 TWh 90.4% 93.4% 91.7%
Operator: Fujian Ningde Nuclear Power Company, Ltd.
Owner: Fujian Ningde Nuclear Power Company, Ltd.; Fujian Ningde Second Nuclear Power Co., Ltd.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$170
Lodging/Night
$98
M&IE/Day
$268
Total/Day
China: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Ningde, Fujian, China
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Ningde Nuclear Power Plant.

Ningde is a nuclear power plant site at Beiwan village in Qinyu town, Fuding, Ningde, Fujian Province, China.

Read more

The project received approval from the National Development and Reform Commission in 2007, and first concrete for Unit 1 was poured in February 2008. Units 1 to 4 are CPR-1000 pressurized water reactors. Construction began on 18 February 2008, 12 November 2008, 8 January 2010 and 29 September 2010, and the units were connected to the grid on 28 December 2012, 4 January 2014, 21 March 2015 and 29 March 2016. Construction of Hualong One Unit 5 began on 28 July 2024 and Unit 6 on 17 December 2025.